My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-07_PERMIT FILE - C2006085 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2006085
>
2010-05-07_PERMIT FILE - C2006085 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:37 PM
Creation date
6/15/2010 4:55:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2006085
IBM Index Class Name
Permit File
Doc Date
5/7/2010
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. All structures will be designed and constructed, and will be utilized and <br />maintained, to provide for specific needs and minimize potential <br />environmental damage and safety hazards. Engineering designs will be <br />prepared for the facility structures to insure compliance with applicable <br />local building codes. Proposed construction specifications provided <br />herein are based on typical building requirements that are best suited <br />to the site and intended uses. <br />Upon completion of mining and related operations, physical structures <br />will be salvaged, demolished, or remain if approved to support <br />postmining land use. Demolition debris remaining after structure <br />salvage procedures will be placed in designated disposal sites in the <br />portal face -up area, covered, and the disposal areas reclaimed <br />coincidental with backfilling the surrounding areas. Northfield will <br />obtain approval, as necessary, from Fremont County and the affected <br />landowner prior to disposal of demolition debris within disturbed areas. <br />Disturbed areas will then be regraded, ripped as necessary to alleviate <br />compaction, topsoil will be replaced, and the areas will then be <br />revegetated as described in the reclamation plans in Section 2.05.4. <br />Major structures and facilities to be utilized in conjunction with <br />Northfield's mining and related operations include the following: <br />- Mi Portal <br />- Mihe Ventilation Shafts <br />- Mine Fan, Fan Housing, and Emergency Escape Hoist <br />- Mine Office /Bathhouse /Warehouse Building <br />- Shop Building <br />- Storage Areas <br />- Crushing and Screening Facility <br />- Coal Conveyors <br />- Truck Scale and Scale House <br />- Topsoil Stockpiles <br />- Mine Waste Permanent Stockpile <br />- Mine Roads <br />- Ponds, Impoundments, and Diversions <br />- Power Transmission Lines and Associated Facilities <br />- Mine Dewatering System <br />- Facility Septic System <br />Descriptions of facilities and structures listed above are presented in <br />the following sections. <br />• <br />2.05.3 -9 Revised 12/04/09, TR -01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.