Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION _. <br />Task # : 063 State : Colorado Permit/job # : C -96 -083 <br />Date : 1110212009 <br />User: JRS <br />County : Delta <br />Site Bowie No. 2 Mine <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : 2009 Midterm Review _ <br />Task description : Rip Regraded Mine Area Prior to Topsoil Replacement <br />3 <br />HOURLY EQUIPMENT COST <br />Basic machine Cat D10R - 10SU (2005) Horsepower: 570 <br />Blade type Semi - Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2: 3-shank ripper <br />Cost Breakdown : Ownership cost/hour: <br />Dozer operating cost/hour: <br />Ripper operating cost/hour: <br />Operator cost/hour <br />Total unit cost/hour <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : NA NA Load factor <br />Area : 169.00 acres Rip depth (ft) <br />Data source : ( CRG) <br />Utilization % <br />$ 86.56 NA <br />$126.50 100 <br />$8.09 100 <br />$38.54 NA <br />$259.69 Total fleet cost/hour: $1,038.77 <br />Selected estimating method : Area <br />NA Bank volume <br />2.63 Volume <br />NA BCY <br />717,078 BCY or CCY <br />Source of estimated quantity Total Regraded Area (Ripping per Page 2.05 -48) <br />Source of estimated load factor : NA <br />p <br />rt <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity: <br />NA <br />feet/second <br />Unadjusted production : <br />NA <br />cu. yds. /hour <br />Altitude adjustment: <br />Area : Avg. ripping depth : <br />2.88 <br />feet/pass <br />Average ripping width : <br />8.67 <br />feet/pass <br />Average ripping length : <br />100.00 <br />feet/pass <br />Average dozer speed : <br />88.00 <br />feet/minute <br />Average maneuver time: <br />0.25 <br />minutes /pass <br />Production per unit area : <br />0.861 <br />acres /hour <br />Unadjusted production : <br />4,002.41 <br />cu. yds. /hour <br />JOB TIME AND COST <br />Fleet size : 4 dozer(s) <br />Unadjusted production <br />per selected method : <br />4,002.41 <br />Cu. yds. /hour <br />Site altitude : <br />6,500 <br />feet <br />Altitude adjustment: <br />1.00 <br />(Cat HB) <br />Job efficiency factor: <br />0.83 <br />(1 shift/day) <br />Net job correction : <br />0.83 <br />multiplier <br />Adjusted unit production : <br />3,322.00 <br />cu. yds. /hour <br />Adjusted fleet production : <br />13,288.01 <br />cu. yds. /hour <br />M <br />Total job time : <br />53.96 <br />hours <br />Abbreviation : none <br />Filename :C083 -063 <br />Unit cost : $0.078 per cu. yd. Total job cost: $56,056 <br />'J <br />