Laserfiche WebLink
CIRCES Cost Estimatina Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task #: 062 State : Colorado Permitijob # : C -96 -083 <br />Date : 1110212009 County : Delta Abbreviation : none _ <br />User: JRS Site Bowie No. 2 Mine Filename : C083 -062 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : 2009 Midterm Review <br />Task description : Rip Truck Loadouf/Coal Stockpile Area <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - 10SU (2005) Horsepower: 570 <br />Blade type Semi - Universal <br />Attachment no. 1 : ROPS Cab Shift basis: 1 per day <br />Attachment no. 2 : 3-shank ripper <br />Data source : (CRG) <br />Utilization % <br />Cost Breakdown : <br />Ownership cost/hour: <br />$86.56 <br />NA <br />Dozer operating cost/hour : <br />$126.50 <br />100 <br />Ripper operating cost/hour : <br />$8.09 <br />100 <br />Operator cost/hour: <br />$38.54 <br />NA <br />Total unit cost/hour : <br />$259.69 Total fleet cost/hour: <br />$1,038.77 <br />MATERIAL QUANTITIES <br />Selected estimating method : <br />Area <br />Alternate methods - <br />Seismic : NA <br />NA Load factor: <br />NA Bank volume: <br />NA <br />BCY <br />Area : 5.00 <br />acres Rip depth (ft) : <br />2.63 Volume: <br />21,215 <br />BCY or CCY <br />Source of estimated quantity Map 15 -1 <br />Source of estimated <br />load factor : <br />r <br />HOURLY PRODUCTION <br />Alternate methods - <br />Job Condition Correctio Factors - <br />Seismic : Seismic velocity: <br />NA feet/second <br />Unadjusted production <br />Unadjusted production : <br />NA cu. yds. /hour <br />per selected method : <br />3,390.93 <br />cu. yds. /hour <br />Area : Avg. ripping depth : <br />2.88 feet/pass <br />Site altitude : <br />6,000 <br />feet <br />Average ripping width : <br />8.67 feet/pass <br />Altitude adjustment: <br />1.00 <br />(Cat HB) <br />Average ripping length : <br />50.00 feet/pass <br />Job efficiency factor: <br />0.83 <br />(1 shift/day) <br />Average dozer speed: <br />88.00 feet/minute <br />Net job correction : <br />0.83 <br />multiplier <br />Average maneuver time: <br />0.25 minutes /pass <br />Production per unit area : <br />0.730 acres /hour <br />Adjusted unit production : <br />2,814.47 <br />cu. yds. /hour <br />Unadjusted production : <br />3,390.93 cu. yds. /hour I <br />Adjusted fleet production : <br />11,257.90 <br />cu. yds. /hour <br />.. <br />�,.. .,_ _,. ..-. -„ .. v..t. s.":.;m� C z., ..,.. ,_s_.�, ,.. Y „ .. <.r,. ,. .. _. ._ .m.r <br />... ,.,...nS^ n....., .. ,.,, _, ., ,.°'" ".' ✓...r <br />JOB TIME AND COST <br />Fleet size : <br />4 dozer(s) <br />Total job time: <br />1.88 <br />hours <br />Unit cost : <br />$0.092 per cu. yd. <br />Total job cost: <br />$1,958 <br />