Laserfiche WebLink
Agency or organization name Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : 2009 Midterm Review <br />Task description Compact Backfilled Material at Truck Loadout/Coal Stockpile <br />HOURLY EQUIPMENT COST <br />Machine description : CAT 815F Horsepower: 240 <br />Compactor type : Soil - tamping foot Shift basis : 1 per d ay <br />Cost Breakdown : Ownership cost/hour : <br />Operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />MATERIAL QUANTITIES <br />Loose Shrinkage <br />volume: 67,920 LCY factor <br />Utilization % Data source : (CRG) <br />$44.16 NA <br />$78.47 100 <br />$38.54 NA <br />$161.17 Total fleet cost/hour : $161.17 <br />Compacted <br />0.875 volume: 59,430 CCY <br />Source of estimated volume : Operator Estimate <br />Source of estimated shrinkage factor : CAT Handbook <br />... .. .... <br />. <br />HOURLY PRODUCTION <br />Unadiusted hourlv production = (W x S x L x C) / P <br />Compacted width per pass (W) : <br />6.42 <br />CIRCES Cost Estimating Software <br />Average compactor speed (S) : <br />4.00 <br />COMPACTION WORK <br />Compacted thickness of each lift (L) : <br />8.00 <br />inches <br />Conversion constant (C) : <br />PROJECT IDENTIFICATION <br />(5,280 ft./12 in. 127 cu.ft.) <br />Required number of machine passes (P) : <br />Task # : <br />051 <br />State : Colorado <br />Permit/job # : C -96 -083 <br />Date : <br />02- Nov -2009 <br />County : Delta <br />Abbreviation : none <br />User: <br />JRS <br />Site Bowie No. 2 Mine <br />Filename : C083 -051 <br />Agency or organization name Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : 2009 Midterm Review <br />Task description Compact Backfilled Material at Truck Loadout/Coal Stockpile <br />HOURLY EQUIPMENT COST <br />Machine description : CAT 815F Horsepower: 240 <br />Compactor type : Soil - tamping foot Shift basis : 1 per d ay <br />Cost Breakdown : Ownership cost/hour : <br />Operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />MATERIAL QUANTITIES <br />Loose Shrinkage <br />volume: 67,920 LCY factor <br />Utilization % Data source : (CRG) <br />$44.16 NA <br />$78.47 100 <br />$38.54 NA <br />$161.17 Total fleet cost/hour : $161.17 <br />Compacted <br />0.875 volume: 59,430 CCY <br />Source of estimated volume : Operator Estimate <br />Source of estimated shrinkage factor : CAT Handbook <br />... .. .... <br />. <br />HOURLY PRODUCTION <br />Unadiusted hourlv production = (W x S x L x C) / P <br />Compacted width per pass (W) : <br />6.42 <br />feet <br />Average compactor speed (S) : <br />4.00 <br />mph <br />Compacted thickness of each lift (L) : <br />8.00 <br />inches <br />Conversion constant (C) : <br />16.3 <br />(5,280 ft./12 in. 127 cu.ft.) <br />Required number of machine passes (P) : <br />3 <br />passes <br />Unadjusted hourly unit production : <br />1,116.22 <br />CCY /hr <br />Job Condition Correction Factors Source <br />Site altitude : 6,000 feet Altitude adjustment factor: 1.00 (Cat HB) <br />Job efficiency factor: 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br />