Laserfiche WebLink
CIRCES Cost Estimating Software <br />COMPACTION WORK <br />PROJECT IDENTIFICATION <br />Task # 050 <br />Date 02-Nov-2009 <br />User: JRS <br />State : Colorado <br />County :Delta <br />Site: Bowie No. 2 Mine <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :2009 Midterm Review <br />Task description: Compact Backfilled D-Portal Bench, Roads and Utility Corridor <br />HOURLY EQUIPMENT COST <br />Machine description : CAT 815F <br />6.42 <br />Horsepower: <br />240 <br />4.00 <br />mph <br />Compactor type : Soil - tamping foot <br />8.00 <br />Shift basis: <br />I per day <br />16.3 <br />(5,280 ft./12 in./27 cu.ft.) <br />Utilization % <br />Data source : <br />(CRG) <br />Cost Breakdown Ownership cost/hour: $44.16 <br />NA <br />CCY/hr <br />hours <br />Operating cost/hour: $78.47 <br />100 <br />$94,238 <br />Operator cost/hour: $38.54 <br />NA <br />Total unit cost/hour $161.17 <br />Total <br />fleet cost/hour: <br />$161.17 <br />MATERIAL QUANTITIES <br />Loose Shrinkage <br />Compacted <br />volume 619,112 LCY factor 0.875 <br />volume: <br />541,723 <br />CCY <br />Source of estimated volume : Total of All Backfilling Tasks <br />Source of estimated shrinkage factor: CA Handbook <br />HOURLY PRODUCTION <br />Unadiusted hourlv oroduction = (W x S x L x C) / P <br />Compacted width per pass (W) : <br />6.42 <br />feet <br />Average compactor speed (S) <br />4.00 <br />mph <br />Compacted thickness of each lift (L) <br />8.00 <br />inches <br />Conversion constant (C) <br />16.3 <br />(5,280 ft./12 in./27 cu.ft.) <br />Required number of machine passes (P) <br />3 <br />passes <br />Unadjusted hourly unit production <br />1,116.22 <br />CCY/hr <br />Job Condition Correction Factors <br />Site altitude : 6,500 feet <br />Source <br />Altitude adjustment factor 1.00 (Cat HB) <br />Job efficiency factor: 0.83 ( shift/day) <br />Net job correction : 0.83 multiplier <br />Permit/job #: C-96-083 <br />Abbreviation :none <br />Filename :C083 -050 <br />Adjusted hourly unit production <br />926.47 <br />CCY/hr <br />Adjusted hourly fleet production <br />926.47 <br />CCY/hr <br />JOB TIME AND COST <br />Fleet size <br />I compactor(s) Total job time <br />584.72 <br />hours <br />Unit cost <br />$0.174 per CCY Total job cost: <br />$94,238 <br />Permit/job #: C-96-083 <br />Abbreviation :none <br />Filename :C083 -050 <br />