My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-09_PERMIT FILE - C1996083A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2010-04-09_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:03:39 PM
Creation date
6/9/2010 4:33:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/9/2010
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate MR118 (MT3)
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COMPACTION WORK <br />PROJECT IDENTIFICATION <br />Task # : 041 State : Colora Permit/job # : C -1996 -083 <br />Date <br />User <br />02- Nov -2009 <br />JRS <br />County : Delta <br />Site Bowie No. 2 Mine <br />Abbreviation :none <br />Filename :C083 -041 <br />Agency or organization name Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : 2009 Midterm Review <br />Task description: Compact Refuse at Gob Pile #3 <br />HOURLY EQUIPMENT COST <br />Machine description :CAT 815F <br />Compactor type Soil - tamping fo <br />Cost Breakdown: Ownership cost/hour : <br />Operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />MATERIAL QUANTITIES <br />Loose Shrinkage <br />volume: 200,000 LCY factor <br />Horsepower: 240 <br />Shift basis : 1 per day <br />Utilization % Data source : ( CRG ) <br />$44.16 NA <br />$78.47 100 <br />$38.54 NA <br />$161.17 Total fleet cost/hour : $ 161.17 <br />Compacted <br />0.8 70 volume: 174,000 CCY <br />Source of estimated volume : Volume Xl, Page 1 <br />Source of estimated shrinkage factor : CAT Handbook <br />HOURLY PRODUCTION <br />Unadiusted houriv production = (W x S x L x C) / P <br />Compacted width per pass (W) <br />Average compactor speed (S) <br />Compacted thickness of each lift (L) <br />Conversion constant (C) <br />Required number of machine passes (P) <br />Unadjusted hourly unit production <br />Job Condition Correction Factors <br />Site altitude : 5,900 feet <br />6.42 feet <br />4.00 mph <br />12.00 inches <br />16.3 (5,280 ft. /12 in. /27 cu.ft.) <br />3 passes <br />1,674.34 CCY /hr <br />Source <br />Altitude adjustment factor : 1.00 <br />(Cat HB) <br />Job efficiency factor: 0.83 <br />(1 shift/day) <br />Net job correction : 0.83 <br />multiplier <br />Adjusted hourly unit production : 1,389.70 CCY /hr <br />Adjusted hourly fleet production : 1,389.70 CCY /hr <br />JOB TIME AND COST <br />Fleet size : 1 compactor(s) Total job time: 125.21 hours <br />Unit cost : $0.116 per CCY Total job cost: $20,179 <br />YN-. <br />
The URL can be used to link to this page
Your browser does not support the video tag.