My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-09_PERMIT FILE - C1996083A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2010-04-09_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:03:39 PM
Creation date
6/9/2010 4:33:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/9/2010
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate MR118 (MT3)
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinci Software <br />COMPACTION WORK <br />PROJECT IDENTIFICATION <br />Task #: 040 State : Colorado Permit/job # : C- 1996 -083 <br />Date : 02- Nov -2009 County : Delta Abbreviation : none <br />User: JRS Site Bowie No. 2 Mine Filename :C0 -040 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : 2009 Midterm Review <br />Task description : Compact Refuse on Gob Pile #2 <br />HOURLY EQUIPMENT COST <br />Machine description : CAT 815F Horsepower: 240 <br />Compactor type : Soil - tamping foot Shift basis : 1 per day <br />Cost Breakdown : Ownership cost/hour : <br />Operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour <br />MATERIAL QUANTITIES <br />Loose Shrinkage <br />volume: 175,000 LCY factor: <br />Utilization % Data source : (CRG) <br />$44.16 NA <br />$78.47 100 <br />$38.54 NA <br />$161.17 Total fleet cost/hour : $161.17 <br />Compacted <br />0.900 volume: 157,500 COY <br />Source of estimated volume TR -44 Page 4 <br />Source of estimated shrinkage factor CAT Handbook <br />HOURL _._. ... ___. _..____ _ _ <br />_Y PRODUCTION ____ ��� _ _ __ <br />Unadiusted houriv production = (W x S x L x C) / P <br />Compacted width per pass (W) : <br />6.42 <br />feet <br />Average compactor speed (S) : <br />4.00 <br />mph <br />Compacted thickness of each lift (L) : <br />12.00 <br />inches <br />Conversion constant (C) : <br />16.3 <br />(5,280 ft./12 in. /27 cu.ft.) <br />Required number of machine passes (P) : <br />3 <br />passes <br />Unadjusted hourly unit production : <br />1,674.34 <br />CCY /hr <br />Job Condition Correction Factors Source <br />Site altitude : 6,100 feet Altitude adjustment factor :_ 1.00 (Cat HB) <br />Job efficiency factor: 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br />
The URL can be used to link to this page
Your browser does not support the video tag.