My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-09_PERMIT FILE - C1996083A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2010-04-09_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:03:39 PM
Creation date
6/9/2010 4:33:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/9/2010
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate MR118 (MT3)
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION <br />Haulina Capacity: <br />Scraper Payload (weight) Basis: <br />Material weight: 2,900 pounds /LCY <br />Material description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Rated payload: 48,0 pounds <br />Payload capacity : 16.55 LCY <br />sheet 2 of 2 <br />Scraper Bowl (volume) Basis: <br />Struck volume: <br />15.70 <br />LCY <br />Heaped volume: <br />21.00 <br />LCY <br />Average volume: <br />18.35 <br />LCY <br />Adjusted capacity : <br />16.55 <br />LCY * ** <br />'hourly production reflects volume per scraper pair on push -pull models <br />Cycle Time: <br />Haul distance (feet) <br />Job Condition Co rrections : Site altitude (ft.) : 6,750 <br />Roll. res. ( %) <br />Total res. ( %) <br />Velocity (fpm) <br />Scraper <br />Push dozer <br />Source <br />Scraper loading time * : 0.90 minutes <br />3.00 <br />Altitude adj.: <br />1.000 <br />NA <br />(Cat HB) <br />Maneuver and spread time : 0.60 minutes <br />Job efficiency : <br />0.830 <br />NA <br />(Cat HB) <br />* load time per scraper pair on push -pull models <br />Net correction : <br />0.830 <br />NA <br />Travel time: <br />Road condition description : Firm, smooth, rolling, dirt/It. surfaced, watered, maintained <br />Haul Route: <br />Seg. # <br />Haul distance (feet) <br />Grade ( %) <br />Roll. res. ( %) <br />Total res. ( %) <br />Velocity (fpm) <br />Travel time (min.) ** <br />1 <br />800 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />0.52 <br />0.40 <br />Haul time: <br />0.52 <br />minutes <br />Return ro ute <br />1 <br />800 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />0.40 <br />*' travel time for each segment is adjusted for acceleration /deceleration. <br />Return time : <br />0.40 <br />minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : <br />2.43 <br />minutes <br />Unadjusted unit production /hour : 819.02 LCY /hour * ** <br />Adjusted for job conditions : <br />679.79 <br />LCY /hour <br />Optimal number of scrapers per push dozer: NA <br />Selected number of scrapers : <br />2 <br />scraper(s) <br />Adjusted single scraper team (unit) hourly production : <br />679.79 <br />LCY /hour <br />Adjusted multiple scraper <br />team (fleet) hourly production : <br />679.79 <br />LCY /hour <br />It <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) <br />Total job time : <br />90.83 <br />Hours <br />Unit cost: $0. ICY <br />Total job cost : <br />$39,213 <br />W.. 4P ` <br />
The URL can be used to link to this page
Your browser does not support the video tag.