My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-09_PERMIT FILE - C1996083A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2010-04-09_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:03:39 PM
Creation date
6/9/2010 4:33:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/9/2010
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate MR118 (MT3)
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Sof tare - <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />013 State : Co Permit/job #: C -96 -083 <br />1110212009 County : Delta ,Abbreviation : none <br />JRS Site Bowie No. 2 Mine Filename:C083 -013 <br />Permit or other job action : 2009 Midterm Review <br />Task description Haul Fill from Upper Material Storage Area to B -Seam Portal Bench <br />HOURLY EQUIPMENT COST <br />Description <br />Cost Bre <br />Shift basis: 1 per day <br />Scraper work team - Scraper : Cat 627G w /push -pull <br />-Push dozer:NA <br />Support equipment -Load area : INA <br />-Dump area :NA <br />Road maintenance -Motor grader : INA <br />-Water truck : NA <br />akdown : <br />Scraper Work Team <br />Scraper Dozer <br />Support Equipment <br />Load area Dump area <br />Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : <br />scraper2 <br />NA <br />NA <br />NA <br />NA <br />NA <br />% Utilization-machine: <br />- Ripper attachment: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownerhip cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />$68.97 <br />NA <br />NA <br />NA <br />NA <br />NA <br />$121.90 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$24.98 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit subtotals : <br />Number of units :1 <br />$215.86 <br />NA <br />NA <br />NA <br />NA <br />NA <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group subtotals :1 <br />Work: $431.71 <br />Support : $0.00 <br />Maintenance : $0.00 <br />Total work team cost/hour : $ 431.71 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 53,000 CCY factor : 1.165 volume: 61.745 LCY <br />Source of quantity take -off : Operator Estimate <br />Source of estimated swell factor : CAT Handbook <br />
The URL can be used to link to this page
Your browser does not support the video tag.