My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-08_PERMIT FILE - P2010013 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2010013
>
2010-06-08_PERMIT FILE - P2010013 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:54 PM
Creation date
6/9/2010 3:36:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010013
IBM Index Class Name
PERMIT FILE
Doc Date
6/8/2010
Doc Name
New NOI application (non-confidential)
From
Lynx-Royal JV LLC
To
DRMS
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A - DRMS Form 2 Confidential <br />Lynx-Royal JV LLC Egnar K1 2010 NOI <br />No more than two drill holes will be left open at any one time. <br />A) Plugging Procedure <br />- _Dry or Damp Hole - The drill hole will be backfilled as much as possible with <br />cuttings, using the mineralized material first. After backfilling to within about 5 <br />feet from the surface, a spray foam plug or concrete plug will be brought to within <br />about 2 feet of the surface. The remainder of the hole to the surface will be filled <br />with soil and cuttings. <br />- Wet Hole - Non-flowing Aquifer. While not expected to occur, the hole will be <br />backfilled with a thick bentonitic mud with a > 50 second viscosity to a point 50 <br />feet above the static water level. The mud will be pumped to the bottom of the <br />hole through the drill pipe and the pipe will be periodically withdrawn as the mud <br />level rises in the hole. If closure occurs when the drill rig is not available, <br />3/8"bentonite chips will be added to the hole in a manner as to avoid bridging <br />until the bentonite chip backfill column is at least 50 feet above the static water <br />level. The remainder of the hole will be backfilled as per a dry or damp hole. <br />- Wet Hole - Flowing Aquifer. While considered highly unlikely, if a flowing <br />aquifer is penetrated, then drilling will pause and the permitting agencies will be <br />consulted for recommended abandonment methods. <br />B) Surface Restoration - To the extent possible, remaining drill cuttings will be placed <br />into the containment pit for burial. The disturbed ground will be graded and an <br />approved seed mixture (See Attachment C) will be broadcast immediately following <br />reclamation <br />Estimated Reclamation Costs <br />A) Estimated Cost of Drill Hole Abandonment. - The estimated cost of backfilling the <br />proposed drill holes is $1.25/ft. <br />B) Estimated Cost of Surface Restoration - Estimated cost of the surface restoration is <br />approximately $400.00 per hole plus $200 for the access route. <br />Costs include all materials, labor, equipment, mob-demob, contractors overhead, profit and State <br />supervision charges. <br />Total reclamation cost is estimated at $5, 500. <br />Compliance with Statues and Regulations <br />For exploration, Lynx-Royal JV LLC will use the services of contractors. All Lynx-Royal JV <br />LLC contracts with service companies will contain specific sections requiring compliance with <br />all applicable Federal, State and local statues and regulations. <br />Page 4 of 5
The URL can be used to link to this page
Your browser does not support the video tag.