Laserfiche WebLink
Dave Berry Letter Description Location of Answer <br />May 18, 2010 <br />Question # <br />7 All pending adequacy issues must be Throughout the entire PR-06 <br /> fully and adequately addressed. WFC submittal. <br /> has made a strong attempt to <br /> accomplish this, as each item is <br /> addressed in this letter. <br />8 All plans must be coordinated with the See updated subsection 2.0 in <br /> landowners. Provide documentation. Section 2.05.4(2)(e). See Map <br /> WFC has revised the Morgan property 2.05.4-5. A new Attachment <br /> reclamation to be exactly what they 2.05.4(2)(e)-8 has also been <br /> desire (full irrigated cropland). The provided to specifically <br /> Lloyd and Benson west properties have address landowner <br /> also been revised to include flood communication. <br /> irrigated pasture, to the extent that the <br /> water is available. All properties on the <br /> east side of 2700 Road are in various <br /> stages of reclamation and many <br /> landowners have been present for the <br /> bond release inspections. . <br />9 WFC disputes that soils management Hopefully, to be supplied <br /> practices were implemented without within a reasonable time <br /> the consultation with the landowner. frame. <br /> WFC continues to work with the <br /> landowner on the entire Permit <br /> Revision 06 and has provided a full <br /> copy of the submittal to them. WFC <br /> will also do its best to provide <br /> documentation of resolution of the <br /> permit issues, if they ever can be <br /> obtained. <br />15