Laserfiche WebLink
New Drainage Culvert <br />MR238 7/13/2009 TORT Monitoring Borehole and Miscellaneous Facilities <br />MR239 10/8/2009 Water Treatment Pilot Project <br />MR240 11/20/2009 Security Gate Installation <br />MR241 3/5/2010 Change in Operator Name <br />Technical Revisions: <br />Revision No. Approval date Nature of revision <br /> <br />TR43 7/22/2004 Change in Ownership and Control Interests <br />TR44 9/10/2004 Permit to Construct the 18 Right Intake Ventilation <br /> Shaft and Associated Facilities <br />TR45 5/23/2005 Inclusion of SAEs in the PAP <br />TR46 4/18/2005 Clarification of Existing, Approved Haul Road <br /> Classification and Configurations <br />TR47 4/18/2005 Definition of Two Impoundments <br />TR48 9/14/2005 Permit to Construct the 6 North Main Shaft and <br /> Associated Equipment and Facilities <br />TR49 10/17/2005 Description of Coal Mine Waste Embankment Operations <br />TR50 10/13/2005 Modification of Topsoil Stockpiles at the 18-Right <br /> Ventilation Shaft <br />TR51 6/28/2006 Modification to Permit Boundary <br />TR52 6/28/2006 Response 2005 Midterm Review <br />TR53 6/28/2006 Addition of Truck Loadout <br />TR54 10/5/2006 Conversion of an Access Road to Temporary Haul Road <br /> C-1 (Withdrawn) <br />TR55 10/12/2006 Construction of a Haul Road from Routt County Road 27 <br /> Interchange to the Truck Coal Loadout <br />TR56 9/22/2006 Construction of 4 Additional Culverts on the 6-Main North <br /> Access Road <br />TR57 9/4/2009 Modification of 6MN Sedimentation Pond <br />TR58 3/25/2008 Modification of Designs for Coal Refuse Disposal Facility <br /> (Withdrawn) <br />TR59 4/20/2007 Addition of a Wash Plant and Associated Work <br />TR60 7/24/2007 New Thickener Underflow Lines and Associated Ancillary <br /> Facilities <br />TR61 9/16/2008 6MN Mine Waste Storage Reservoir <br />TR62 2/4/2008 6 Main North Reservoir Geotechnical Investigation <br />TR63 11/1/2007 Realign Western Mining District Development Entries <br />TR64 10/3/2008 Phase II Development of Western Mining District <br />TR65 8/22/2008 Modification to Stoker Coal Handling System <br />TR66 4/29/2009 18-Left Shaft Installation and Associated Ancillary <br /> Equipment and Facilities <br />TR67 11/13/2009 Expansion of Coal Refuse Disposal Area <br />TR68 8/10/2009 Interim Phase III Development of Western Mining District <br />TR69 11/25/2009 6 Right Thickener Underflow Borehole and Pipeline <br />Foidel Creek Mine 15 June 4, 2010