My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-04_GENERAL DOCUMENTS - C1982056
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1982056
>
2010-06-04_GENERAL DOCUMENTS - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:46 PM
Creation date
6/8/2010 8:39:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
General Documents
Doc Date
6/4/2010
Doc Name
Proposed Decision & Findings of Compliance for RN5
Permit Index Doc Type
Findings
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MR196 9/6/2005 Paving of Parking Lot <br />MR197 9/13/2005 Demolition of Colorado Yampa Coal Company Building <br />MR198 9/13/2005 6-Main North Boreholes <br />MR199 9/29/2005 Repair Conveyor Support. Structures <br />MR200 9/29/2005 18-Right Ventilation Shaft Escape Hoist <br />MR201 10/24/2005 6-North Main Substation Foundation and Pad Installation <br />MR202 10/24/2005 Paving of Mine Ready Line Parking <br />MR203 10/21/2005 Adds Text Designation of a Storage Area <br />MR204 11/28/2005 Addition of Equipment Enclosure <br />MR205 2/14/2006 Addition of Pumphouse, Pumps, and Supporting Utilities <br />MR206 5/8/2006 Revises Weed Management Plan <br />MR207 5/15/2006 Modification of Water Treatment System <br />MR208 8/10/2006 Temporary Construction Dewatering Discharge From 6- <br /> North Main Sedimentation Pond <br />MR209 8/21/2006 Addition of 24-inch Culverts Beneath 6-North Main Access <br /> Road <br />MR210 9/26/2006 Addition of Water Storage Tank at 6MN Shaft <br />MR211 10/12/2006 Provides for Clean-Up of a Coal Fines Spill in Foidel Creek <br />MR212 11/22/2006 Addition of a Dust Tank and Compressor Building at the <br /> 6-North Main Shaft <br />MR213 11/15/2006 Surface Blasting Activities <br />MR214 5/3/2007 Addition of New Thicker Underflow Lines and Associated <br /> Ancillary Facilities (Withdrawn) <br />MR215 6/4/2007 Addition of Optic Fiber Borehole <br />MR216 7/25/2007 Addition of Dewatering Line at the Fish Creek Borehole <br />MR217 7/26/2007 Additions to Warehouse <br />MR218 7/27/2007 Addition of Emergency Escape Hoist at the 6MN Shaft <br />MR219 7/27/2007 Addition of Modular Office Trailer <br />MR220 8/29/2007 Provides for Paving of a Parking Lot and Helipad <br />MR221 8/28/2007 Provides for Enlargement of Drill Pad <br />MR222 9/7/2007 Addition of New Powerlines to Support New Washplant <br />MR223 10/14/2007 Construct Trench across Foidel Creek for Thickener <br /> Underflow Pipeline <br />MR224 11/1/2007 6MN Mine Water Transfer Pipeline <br />MR225 12/5/2007 18-Right Shaft Heater Installation and Operation <br />MR226 1/30/2008 Geotechnical Testing - Refuse Pile Expansion <br />MR227 1/11/2008 6MN Escape Shaft - Temporary Shaft Heaters <br />MR228 6/18/2008 TORT Dewatering Well No. 2 <br />MR229 8/15/2008 18RT Mine Atmosphere Control Borehole <br />MR230 12/8/2008 Mine Dewatering Modifications <br />MR231 11/6/2008 Zero-Entry Water Borehole <br />MR232 12/1/2008 Powerline Construction for 6MN Reservoir <br />MR233 12/15/2008 Refuse Pile Clay Staging Area <br />MR234 2/6/2009 Shaft Heater Modifications <br />MR235 2/19/2009 18-Left Geotechnical Investigations <br />MR236 3/9/2009 6MN Nitrogen Injection Hole and Meteorological Station <br />MR237 6/2/2009 New Discharge Pipeline and Headgate at FCBH Pond and <br />Foidel Creek Mine 14 June 4, 2010
The URL can be used to link to this page
Your browser does not support the video tag.