Laserfiche WebLink
5 <br />Exhibit S Permanent Man Made Structures <br />The damage agreements were signed by Four Corners and the owner of the facilities did not <br />sign and return the agreement and therefore the engineering calculation of slope stability was <br />provided. The half completed damage agreements were included in the application to show <br />that the first part of rule 6.4.19(b) was followed. Since the damage agreements were not <br />returned we proceeded with the second part of rule 6.4.19(6) and provided an engineering <br />slope stability study. It is believed that no further action is required for man made structures <br />within 200 feet of the permit boundary. <br />Please call Matt Carnahan with Four Corners Materials if there are any questions or <br />additional information needed. <br />Sincere <br />Lly <br />tt C Four Corners Materials & Ryan Ellis, Greg Lewicki and Associates <br />Ma <br />encl. <br />ec, w/out encl. R. Ellis