My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-03_REVISION - M1986061 (13)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986061
>
2010-06-03_REVISION - M1986061 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:06:12 PM
Creation date
6/7/2010 1:44:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986061
IBM Index Class Name
REVISION
Doc Date
6/3/2010
Doc Name
Operator's adequacy response
From
Four Corners Materials
To
DRMS
Type & Sequence
AM2
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />Exhibit I, Soils <br />The fertility is shown in the attached Chemical Properties Table from NRCS <br />Soil Type 27 <br />Erodibility: 0.20 <br />Depth : 6"-12" <br />Soil Type 70 <br />Erodibility: 0.28 <br />Depth: 6"-12" <br />Exhibit L, Reclamation Costs <br />Fencing <br />Approximately 3,300 feet of three wire fencing will be removed. This activity will be <br />conducted by Four Corners. Some of this fencing needs to be removed to allow the final <br />center pivot path to be established. It is believed that this will not happen at the worst case <br />reclamation scenario, but will happen as the area is about to be mined. No new fencing is <br />planned as part of the reclamation plan since the irrigated pasture area will be continuous. <br />The perimeter of the Cugnini property is fenced and no new fencing still allows him to run <br />cattle in his land. Grazing will not be conducted until the bond is released. <br />Gas Welland Pipeline Work <br />Approximately 800 feet of gas pipeline will need to be relocated to be able to mine within <br />Mining Area 4. If this pipeline is not moved than the mining operation will not be able to <br />proceed into Mining Area 4. If and when the pipeline is moved a new route will already be <br />installed to prevent any downtime to the gas company. It is believed that the removal and <br />installation of any pipeline should not be included in the reclamation bond because the new <br />line will be installed prior to the existing line being removed and it is not a requirement of the <br />reclamation plan to remove the existing pipeline. <br />Attached with this letter is the proof of filing with the county clerk. <br />Exhibit N, Source of Legal Right to Enter <br />A copy of the notarized Stephenson Letter of Intent is attached. <br />Exhibit R Proof of filing with the County Clerk and Recorder <br />Attached are the last two signed receipts from the La Plata County Clerk and Recorder <br />stating the information that was sent the Divisions office was also submitted to the La Plata <br />County Clerks and Recorders office to be place on public file. I believe the Division has all <br />previous receipts from the La Plata County Clerk and Recorders Office.
The URL can be used to link to this page
Your browser does not support the video tag.