Laserfiche WebLink
88 jhb Peabody Sage Creek Reclamation Cost Estimate <br />C2009 -087 4/27/2010 Stabilize Post - Mining Drainage Channels <br />Rip Rap CY Cost/CY Total Rip Rap Cost Gravel CY Cost/CY Total Gravel Cost Mat SY <br />Cost SY Total Mat Cost <br />Total <br />$51.80 $27.89 <br />$2.37 <br />PM12A 2916.7 <br />$6,912.48 <br />$6,912.48 <br />Total CY 0 $51.80 $0.00 0 $27.89 $0.00 2916.7 <br />$2.37 $6,912.48 <br />$6,912.48 <br />Haul to site Tons $ /ton Tons $ /ton <br />Gravel 0 $7.97 $0.00 <br />$0.00 <br />Rip Rap 0 $19.45 $0.00 <br />$0.00 <br />Total Cost $0.00 $0.00 <br />$6,912.48 <br />$6,912.48 <br />Means 2010 Location adjustment is 105.7% <br />$7,306.50 <br />Gravel - Means Site Work and Landscape Cost Data 2010 - 31 05 16.10 0100 <br />Rip rap - Means Site Work and Landscape Cost Data 2010 - 31 37 13.10 0100 <br />Geotextile Mat - Means Site Work and Landscape Cost Data 2010 - 3132 19.16 1500 <br />Gravel hauling - Means Site Work and Landscape Cost Data 2010- 03 05 13.25 0550 <br />Rip rap hauling - Means Site Work and Landscape Cost Data 2010 - 03 05 13.25 1200 <br />