Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task #: 086 <br />Date : 0412712010 <br />User: JHB <br />State : Colorado <br />County : Routt <br />Site Peabodv Saoe Creek Mine <br />Agency or organization name Division Of Reclamation, <br />Permit or other job action : New application <br />Task description : excavate post -mini <br />HOURLY EQUIPMENT COST <br />And Safety <br />Machine description : Cat 320C <br />Permit/job # : C2009 -087 <br />Abbreviation : none <br />Filename : C087 -086 <br />channel 12A <br />1.63 LCY (heaped) Bucket size class <br />0.50 USER - PROVIDED BUCKET FILL FACTOR <br />Cost Breakdown : <br />Utilization % <br />Ownership cost/hour : <br />$26.97 <br />NA <br />Shift basis : <br />1 per day <br />Operating cost/hour : <br />$32.00 <br />100 <br />Data source : <br />(CRG) <br />Operator cost/hour : <br />$38.72 <br />NA <br />Total unit cost/hour : <br />$9 7.69 <br />Total fleet cost/hour : <br />$97.69 <br />MATERIAL QUANTITIES <br />Initial <br />Swell <br />Loose <br />volume : 444 BCY <br />factor : 1.493 <br />volume: 663 <br />LCY <br />Source of estimated volume: Seneca 11 Exhibit 7 -19 <br />Source of estimated swell factor: Seneca 11 SW Task 081 <br />r f oe <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty) <br />Basic job condition description <br />Secondary job condition within basic description <br />Cycle time value: <br />Bucket Capacity <br />Rated bucket capacity <br />Bucket fill factor <br />Adjusted bucket capacity <br />Horsepower: 138 <br />Weight (MT) : 19.70 <br />SEVERE <br />SEVERE <br />0.39 minutes <br />medium <br />0.81 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 8,000 feet Altitude adjustment: 0.87 I (Cat HB) <br />Job efficiency adjustment: 0.83 (1 shift/day) <br />Net job correction : 0.72 multiplier <br />