My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-07_PERMIT FILE - C2009087A (38)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2009087A
>
2010-05-07_PERMIT FILE - C2009087A (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:41 PM
Creation date
6/3/2010 4:41:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087A
IBM Index Class Name
Permit File
Doc Date
5/7/2010
Doc Name
Estimated Reclamation Cost
Section_Exhibit Name
Exhibit 3.02.2-E1 Estimated Reclamation Cost
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />MOTOR GRADER WORK <br />PROJECT IDENTIFICATION <br />Task #: 084 <br />Date : 0412712010 <br />User: JHB <br />State : Colorado Permit/job # : C2009 -087 <br />County : Routt Abbreviation : none <br />Site Peabody Sage Creek Mine Filename : C087 -084 <br />Agency or organization name : Division Of Reclamation, Mining And Safety <br />Permit or other job action : New application <br />T ask d escription : Regrade ditches (Seneca H SL3 task 20) <br />HOURLY EQUIPMENT COST <br />Basic machine CAT 14H <br />Horsepower: <br />215 <br />Attachment no. 1 : NA <br />Shift basis: <br />1 per day <br />Attachment no. 2 : Multi -shank ripper <br />Effective blade length : <br />NA -user <br />feet to direction of travel. <br />Data source : <br />(CRG) <br />feet <br />Utilization % <br />NA -user <br />Cost Breakdown Ownership cost/hour : $45.57 <br />NA <br />NA -user <br />Grader operating cost/hour : $46.26 <br />100 <br />Job Condition Correction Factors <br />Ripper operating cost/hour : $0.00 <br />0 <br />Average site altitude : NA -user <br />Operator cost/hour : $24.50 <br />NA <br />NA -user <br />Total unit cost/hour : $116.32 <br />Total fleet cost/hour : <br />$116.32 <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 2.00 acres <br />Source of estimated acreage : Seneca 11 SL3 Task 20 <br />HOURLY PRODUCTION <br />Selected application : NA -user provided production d ata <br />Average grader speed : <br />NA -user <br />mph <br />Selected blade angle: <br />NA -user <br />degrees ' ' at 0 degrees, blade is perpendicular <br />Effective blade length : <br />NA -user <br />feet to direction of travel. <br />Width of blade overlap per pass: <br />NA -user <br />feet <br />C� Net grading or ripping width per pass : <br />NA -user <br />feet "" •• width of ripper beam on ripping applications <br />Unadjusted hourly unit production : <br />NA -user <br />acres /hour <br />Job Condition Correction Factors <br />Source <br />Average site altitude : NA -user <br />feet <br />Altitude adjustment factor : NA -user <br />NA -user <br />Job efficiency adjustment factor: NA -user <br />NA -user <br />Net job correction : NA -user multiplier <br />
The URL can be used to link to this page
Your browser does not support the video tag.