My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-07_PERMIT FILE - C2009087A (38)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2009087A
>
2010-05-07_PERMIT FILE - C2009087A (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:41 PM
Creation date
6/3/2010 4:41:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087A
IBM Index Class Name
Permit File
Doc Date
5/7/2010
Doc Name
Estimated Reclamation Cost
Section_Exhibit Name
Exhibit 3.02.2-E1 Estimated Reclamation Cost
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost EsWgtinct Software <br />- <br />PROJECT IDENTIFICATION <br />Task #: 083 State : Colorado Permit/job # : C2009 -087 <br />Date : 0412712010 County : Routt Abbreviation : none <br />User: JHB Site: Peabody Sage Creek Mine Filename : C087 -083 <br />Agency or organization name : Division Of Reclamation, Mining And Safety <br />Permit or other job action : New application <br />Task description finish grade landfill area <br />HOURLY EQUIPMENT COST <br />Basic machine CAT 14H <br />Attachment no. 1 : NA <br />Attachment no. 2 : Multi -shank ripper <br />Horsepower: 215 <br />Shift basis: 1 per day <br />Source of estimated acreage: Seneca 11 permit. Exhibit 13 -2 <br />u— <br />�mm <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0 -2.5 mph) <br />Average grader speed : <br />1.25 <br />Data source : (CRG) <br />Selected blade angle: <br />30 <br />Utilization % <br />Cost Breakdown Ownership cost/hour : <br />$45.57 <br />NA <br />Grader operating cost/hour : <br />$46.26 <br />100 <br />Ripper operating cost/hour : <br />$0.00 <br />0 <br />Operator cost/hour : <br />$24.50 <br />NA <br />Total unit cost/hour : <br />$116.32 <br />Total fleet cost/hour : $116.32 <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 3.00 <br />acres <br />Source of estimated acreage: Seneca 11 permit. Exhibit 13 -2 <br />u— <br />�mm <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0 -2.5 mph) <br />Average grader speed : <br />1.25 <br />mph <br />Selected blade angle: <br />30 <br />degrees " <br />Effective blade length : <br />12.10 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass : <br />10.10 <br />feet <br />Unadjusted hourly unit production : 1.5303 acres /hour <br />` at 0 degrees, blade is perpendicular <br />to direction of travel. <br />width of ripper beam on ripping applications <br />Job Condition Correction Factors Source <br />Average site altitude : 7,200 feet Altitude adjustment factor : 1.00 (Cat HB) <br />Job efficiency adjustment factor: 0.85 (1 sh /d, mod.) <br />Net job correction : 0.8500 multiplier <br />
The URL can be used to link to this page
Your browser does not support the video tag.