Page 2 of 3
<br />Project Identification
<br />Task #: 2
<br />Date: 412912010
<br />User: jhb
<br />Permitting action: New Application
<br />Task description: Demolish structures at South facilites, remove materials and debris
<br />Agency or organization name: Colorado Division of Minerals and Geology
<br />Permit/job#: C2009 -87
<br />Abbreviation:
<br />Filename: C:1jhb1TEAM1Peabody Sage Creek MineXRCEtC2009 -087
<br />Source of unit costs: 2010 RS Means
<br />Last unit cost update:
<br />2010
<br />STRUCTURE or ITEM DESCRIPTION
<br />CIRCES DEMOLITION MENU SELECTION
<br />QUANTITY
<br />UNIT
<br />UNIT COST
<br />TOTAL COST
<br />(Dimensions
<br />in ft or
<br />cf unless noted)
<br />7. a) Compressor building
<br />40 X
<br />50 X
<br />15.0
<br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hal
<br />30,000
<br />278
<br />Cf
<br />$0.27
<br />$
<br />8,100
<br />b) 8" th. Concrete floor
<br />40 X
<br />50
<br />Demo. and on -site disposal in existing pit, 8 in. thick - Max. 10,000 ft. hau
<br />2,000
<br />49 Sf
<br />$
<br />2.38
<br />$
<br />4,760
<br />c) 8" dia borehole
<br />250 ft.
<br />Borehole task sealing task 078
<br />#VALUE!
<br />d) 2 Rock Dust Tanks
<br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hal
<br />1,131
<br />Sf
<br />0.27
<br />$
<br />305
<br />e) 12.25' dia. Rock Dust Borehole
<br />Borehole task sealing task 078
<br />$
<br />f) Rock Dust Tank Pads
<br />Slab on grade, concrete, demolition only - Rod reinforcing
<br />22
<br />22 Cy
<br />$
<br />111.00
<br />$
<br />2,442
<br />push 22 cy broken concrete to pit incl.
<br />in unit cost
<br />$
<br />8. a) Coal handling conveyor
<br />1250
<br />Conveyor, elevated, including supports - 5 ft. W x 6 ft. H housing
<br />1,250
<br />12
<br />If
<br />$41.31
<br />$
<br />51,638
<br />b) Coal Handling drive building
<br />30 x
<br />30 X
<br />30.0
<br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 50 ft. push C
<br />27,000
<br />250
<br />Cf
<br />$
<br />0.21
<br />$
<br />5,724
<br />Conveyor drive building floor
<br />30 x
<br />30 x
<br />1.0
<br />Demo. and on -site disposal in existing pit 12 in. thick - Max. 50 ft. push
<br />900
<br />33 sf
<br />$
<br />3.51
<br />$
<br />3,159
<br />c) conveyor Transfer building
<br />40 x
<br />40 X
<br />30.0
<br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 200 ft. push
<br />48,000
<br />444
<br />Cf
<br />$
<br />0.18
<br />$
<br />8,832
<br />conveyor transfer building floor
<br />40 X
<br />40 X
<br />1.0
<br />Demo. and on -site disposal in existing pit 12 in. thick - Max. 200 ft. push
<br />1,600
<br />59 sf
<br />$
<br />3.55
<br />$
<br />5,680
<br />d) Radial stacker -250 ft. x 50 ft. h.
<br />250 X
<br />50 x
<br />6.0
<br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 200 ft. push
<br />75,000
<br />694
<br />Cf
<br />$0.24
<br />$
<br />18,150
<br />9. Electrical Substation just footers
<br />100 X
<br />200 x
<br />8.0
<br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hal
<br />160,000
<br />1,481
<br />Cf
<br />$
<br />0.27
<br />$
<br />43,200
<br />4 8" cased boreholes 250ft. deep
<br />Borehole task sealing task 078
<br />$
<br />"
<br />a) Powedines
<br />26500
<br />Powedine or telephone line, overhead, wood - Single pole
<br />26,500
<br />If
<br />$
<br />2.77
<br />$
<br />73,405
<br />b) remove 496 cy gravel
<br />task 082
<br />600
<br />$2.30
<br />$
<br />$
<br />1,380
<br />c) remove security fence and gate
<br />600
<br />Fencing, chain link, including posts and fabric -to 6 ft. high
<br />10. a) Water storage Tank 10K
<br />10K
<br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hai
<br />1,337
<br />12
<br />Cf
<br />$
<br />0.27
<br />$
<br />361
<br />b) water tank foundation
<br />12
<br />Demo. and on -site disposal in existing pit 6 in. thick - Max. 10,000 ft. haul
<br />64
<br />1 Sf
<br />$
<br />1.79
<br />$
<br />115
<br />c) Well & Pumphouse
<br />10 X
<br />10 X
<br />8.0
<br />Bldg. demo. and on -site disposal in existing pit or cut -Max. 10,000 ft. hal
<br />800
<br />Cf
<br />$0.27
<br />$
<br />216
<br />11. a) Septic Tank 120,000 gal
<br />RS Means 2010 02 41 13.441100
<br />1
<br />ea
<br />$31,300.00
<br />$
<br />37,560
<br />b) Lift Station
<br />10 X
<br />10 x
<br />8.0
<br />Bldg. demo. and on -site disposal in existing pit or cut -Max. 10,000 ft. hai
<br />800
<br />Cf
<br />$
<br />0.27
<br />$
<br />216
<br />$
<br />12. Covered storage Buildings
<br />two buildings
<br />150 X
<br />50 x
<br />20.0
<br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hai
<br />300,000
<br />2,778
<br />Cf
<br />$
<br />0.27
<br />$
<br />81,000
<br />two buildings
<br />100 x
<br />30 X
<br />20.0
<br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hai
<br />120,000
<br />1,111
<br />Cf
<br />$
<br />0.27
<br />$
<br />32,400
<br />footers for 4 storage bldgs.
<br />500
<br />320
<br />Demo. and on -site disposal in existing pit, 1.0 ft. x 2 ft. - Max. 10,000 ft. h.
<br />820
<br />61 If
<br />$8.27
<br />$
<br />6,781
<br />13. 2 Portal heaters
<br />2 X
<br />10 X
<br />20 x
<br />Bury in pit
<br />na
<br />14. Pump House
<br />40 x
<br />50 x
<br />15
<br />31dg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hau
<br />30,000
<br />278
<br />cf
<br />$
<br />0.27
<br />$
<br />8,100
<br />a) foundation of pumphouse
<br />Slab on grade, concrete, demolition only - Mesh reinforcing
<br />4
<br />4 cy
<br />$
<br />111.00
<br />$
<br />444
<br />page subtotal=
<br />$
<br />393,978