Page 2 of 3 <br />Project Identification <br />Task #: 2 <br />Date: 412912010 <br />User: jhb <br />Permitting action: New Application <br />Task description: Demolish structures at South facilites, remove materials and debris <br />Agency or organization name: Colorado Division of Minerals and Geology <br />Permit/job#: C2009 -87 <br />Abbreviation: <br />Filename: C:1jhb1TEAM1Peabody Sage Creek MineXRCEtC2009 -087 <br />Source of unit costs: 2010 RS Means <br />Last unit cost update: <br />2010 <br />STRUCTURE or ITEM DESCRIPTION <br />CIRCES DEMOLITION MENU SELECTION <br />QUANTITY <br />UNIT <br />UNIT COST <br />TOTAL COST <br />(Dimensions <br />in ft or <br />cf unless noted) <br />7. a) Compressor building <br />40 X <br />50 X <br />15.0 <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hal <br />30,000 <br />278 <br />Cf <br />$0.27 <br />$ <br />8,100 <br />b) 8" th. Concrete floor <br />40 X <br />50 <br />Demo. and on -site disposal in existing pit, 8 in. thick - Max. 10,000 ft. hau <br />2,000 <br />49 Sf <br />$ <br />2.38 <br />$ <br />4,760 <br />c) 8" dia borehole <br />250 ft. <br />Borehole task sealing task 078 <br />#VALUE! <br />d) 2 Rock Dust Tanks <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hal <br />1,131 <br />Sf <br />0.27 <br />$ <br />305 <br />e) 12.25' dia. Rock Dust Borehole <br />Borehole task sealing task 078 <br />$ <br />f) Rock Dust Tank Pads <br />Slab on grade, concrete, demolition only - Rod reinforcing <br />22 <br />22 Cy <br />$ <br />111.00 <br />$ <br />2,442 <br />push 22 cy broken concrete to pit incl. <br />in unit cost <br />$ <br />8. a) Coal handling conveyor <br />1250 <br />Conveyor, elevated, including supports - 5 ft. W x 6 ft. H housing <br />1,250 <br />12 <br />If <br />$41.31 <br />$ <br />51,638 <br />b) Coal Handling drive building <br />30 x <br />30 X <br />30.0 <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 50 ft. push C <br />27,000 <br />250 <br />Cf <br />$ <br />0.21 <br />$ <br />5,724 <br />Conveyor drive building floor <br />30 x <br />30 x <br />1.0 <br />Demo. and on -site disposal in existing pit 12 in. thick - Max. 50 ft. push <br />900 <br />33 sf <br />$ <br />3.51 <br />$ <br />3,159 <br />c) conveyor Transfer building <br />40 x <br />40 X <br />30.0 <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 200 ft. push <br />48,000 <br />444 <br />Cf <br />$ <br />0.18 <br />$ <br />8,832 <br />conveyor transfer building floor <br />40 X <br />40 X <br />1.0 <br />Demo. and on -site disposal in existing pit 12 in. thick - Max. 200 ft. push <br />1,600 <br />59 sf <br />$ <br />3.55 <br />$ <br />5,680 <br />d) Radial stacker -250 ft. x 50 ft. h. <br />250 X <br />50 x <br />6.0 <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 200 ft. push <br />75,000 <br />694 <br />Cf <br />$0.24 <br />$ <br />18,150 <br />9. Electrical Substation just footers <br />100 X <br />200 x <br />8.0 <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hal <br />160,000 <br />1,481 <br />Cf <br />$ <br />0.27 <br />$ <br />43,200 <br />4 8" cased boreholes 250ft. deep <br />Borehole task sealing task 078 <br />$ <br />" <br />a) Powedines <br />26500 <br />Powedine or telephone line, overhead, wood - Single pole <br />26,500 <br />If <br />$ <br />2.77 <br />$ <br />73,405 <br />b) remove 496 cy gravel <br />task 082 <br />600 <br />$2.30 <br />$ <br />$ <br />1,380 <br />c) remove security fence and gate <br />600 <br />Fencing, chain link, including posts and fabric -to 6 ft. high <br />10. a) Water storage Tank 10K <br />10K <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hai <br />1,337 <br />12 <br />Cf <br />$ <br />0.27 <br />$ <br />361 <br />b) water tank foundation <br />12 <br />Demo. and on -site disposal in existing pit 6 in. thick - Max. 10,000 ft. haul <br />64 <br />1 Sf <br />$ <br />1.79 <br />$ <br />115 <br />c) Well & Pumphouse <br />10 X <br />10 X <br />8.0 <br />Bldg. demo. and on -site disposal in existing pit or cut -Max. 10,000 ft. hal <br />800 <br />Cf <br />$0.27 <br />$ <br />216 <br />11. a) Septic Tank 120,000 gal <br />RS Means 2010 02 41 13.441100 <br />1 <br />ea <br />$31,300.00 <br />$ <br />37,560 <br />b) Lift Station <br />10 X <br />10 x <br />8.0 <br />Bldg. demo. and on -site disposal in existing pit or cut -Max. 10,000 ft. hai <br />800 <br />Cf <br />$ <br />0.27 <br />$ <br />216 <br />$ <br />12. Covered storage Buildings <br />two buildings <br />150 X <br />50 x <br />20.0 <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hai <br />300,000 <br />2,778 <br />Cf <br />$ <br />0.27 <br />$ <br />81,000 <br />two buildings <br />100 x <br />30 X <br />20.0 <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hai <br />120,000 <br />1,111 <br />Cf <br />$ <br />0.27 <br />$ <br />32,400 <br />footers for 4 storage bldgs. <br />500 <br />320 <br />Demo. and on -site disposal in existing pit, 1.0 ft. x 2 ft. - Max. 10,000 ft. h. <br />820 <br />61 If <br />$8.27 <br />$ <br />6,781 <br />13. 2 Portal heaters <br />2 X <br />10 X <br />20 x <br />Bury in pit <br />na <br />14. Pump House <br />40 x <br />50 x <br />15 <br />31dg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hau <br />30,000 <br />278 <br />cf <br />$ <br />0.27 <br />$ <br />8,100 <br />a) foundation of pumphouse <br />Slab on grade, concrete, demolition only - Mesh reinforcing <br />4 <br />4 cy <br />$ <br />111.00 <br />$ <br />444 <br />page subtotal= <br />$ <br />393,978 <br />