Laserfiche WebLink
Project Identification <br />Task #: 2 <br />Date: 412912010 <br />User: jhb <br />Permitting action: New Application <br />Task description: Demolish structures at South facilites, remove materials and debris <br />STRUCTURE or ITEM DESCRIPTION <br />(Dimensions in ft or cf unless noted) <br />15. Fueling stations 2 x 37.5 75 <br />16. Covered storage 5 buildings <br />a. west of portals <br />100 X <br />30 <br />b. South of portals <br />200 x <br />50 <br />c. South of portals <br />300 X <br />50 <br />d. South of portals <br />250 x <br />50 <br />e. North of portals <br />100 X <br />30 x <br />f. concrete pylons <br />3.14 x <br />5 x <br />17. Oil, MgCl,propane & liquids 37 X 112.5 x <br />18. Powder magazines 2 x 18.75 X <br />19. Remove Culverts <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hai <br />SC -1 (HR A -2) <br />60 x <br />SC -2 (HR D) <br />188 X <br />SC -3 <br />113 x <br />SC-4 <br />80 x <br />SC -5 <br />94 X <br />SC -6 <br />94 x <br />SC -7 <br />50 x <br />SC -8 <br />75 x <br />SC -9 <br />50 x <br />18A <br />50 x <br />52A <br />40 x <br />53A <br />40 x <br />54A <br />50 X <br />55A <br />50 x <br />56A <br />50 X <br />59A <br />50 x <br />64A (no dia. given -est.) <br />50 x <br />20. costs for concrete disposal =M104 X $7.77/CY <br />Page 3 of 3 <br />Agency or organization name: Colorado Division of Minerals and Geology <br />Permit/job#: C2009 -87 <br />Abbreviation: <br />Filename: CAjhb1TEAM1Peabody Sage Creek Mine1RCE1C2009 -087 <br />Source of unit costs: 2010 RS Means <br />CIRCES DEMOLITION MENU SELECTION <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. ha <br />QUANTITY <br />5,625 <br />Last unit cost update: 2010 <br />UNIT UNIT COST TOTAL COST <br />cf $ 0.27 $ 1,519 <br />20 <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hai <br />60,000 <br />556 <br />cf <br />$ 0.27 <br />$ 16,200 <br />20 <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hal <br />200,000 <br />1,852 <br />cf <br />$ 0.27 <br />$ 54,000 <br />20 <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hai <br />300,000 <br />2,778 <br />cf <br />$0.27 <br />$ 81,000 <br />20 <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hal <br />250,000 <br />2,315 <br />cf <br />$ 0.27 <br />$ 67,500 <br />15 <br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hai <br />45,000 <br />417 <br />cf <br />$ 0.27 <br />$ 12,150 <br />92 <br />Demo. and on -site disposal in existing pit, 1.5 ft. x 2 ft. - Max. 200 ft. push <br />460 <br />Pipe, corrugated metal (CMP) - 24 in. diameter pipe <br />51 If <br />$ 12.31 <br />$ 5,663 <br />20 <br />Remove sludge, water, and rem. product from tank - 3,000 to 5,000 gal. <br />1 <br />2 <br />ea. <br />$ 221.00 <br />$ 221 <br />9 X <br />8 Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hai <br />2,813 <br />26 <br />cf <br />$ 0.270 <br />$ 759 <br />2 <br />Pipe, corrugated metal (CMP) - 24 in. diameter pipe <br />60 <br />If <br />$ <br />11.89 <br />$ <br />713.40 <br />2 <br />Pipe, corrugated metal (CMP) - 24 in. diameter pipe <br />188 <br />If <br />$ <br />11.89 <br />$ <br />2,235.32 <br />2 <br />Pipe, corrugated metal (CMP) - 24 in. diameter pipe <br />113 <br />If <br />$ <br />11.89 <br />$ <br />1,337.63 <br />2 <br />Pipe, corrugated metal (CMP) - 24 in. diameter pipe <br />80 <br />If <br />$ <br />11.89 <br />$ <br />951.20 <br />2 x <br />2 <br />Pipe, corrugated metal (CMP) - 24 in. diameter pipe <br />94 <br />If <br />$ <br />11.89 <br />$ <br />2,235.32 <br />2 <br />Pipe, corrugated metal (CMP) - 24 in. diameter pipe <br />94 <br />If <br />$ <br />11.89 <br />$ <br />1,117.66 <br />2 x <br />2 <br />Pipe, corrugated metal (CMP) - 24 in. diameter pipe <br />50 <br />If <br />$ <br />11.89 <br />$ <br />1,189.00 <br />2 x <br />2 <br />Pipe, corrugated metal (CMP) - 24 in. diameter pipe <br />75 <br />If <br />$ <br />11.89 <br />$ <br />1,783.50 <br />2 X <br />2 <br />Pipe, corrugated metal (CMP) - 24 in. diameter pipe <br />50 <br />If <br />$ <br />11.89 <br />$ <br />1,189.00 <br />1.5 <br />Pipe, corrugated metal (CMP) - 18 in. diameter pipe <br />50 <br />If <br />$ <br />8.67 <br />$ <br />433.50 <br />1 <br />Pipe, corrugated metal (CMP) - 12 in. diameter pipe <br />40 <br />If <br />$ <br />6.87 <br />$ <br />274.80 <br />1 <br />Pipe, corrugated metal (CMP) - 12 in. diameter pipe <br />40 <br />If <br />$ <br />6.87 <br />$ <br />274.80 <br />1.5 <br />Pipe, corrugated metal (CMP) - 18 in. diameter pipe <br />50 <br />If <br />$ <br />8.67 <br />$ <br />433.50 <br />1.5 <br />Pipe, corrugated metal (CMP) - 18 in. diameter pipe <br />50 <br />If <br />$ <br />8.67 <br />$ <br />433.50 <br />1.5 <br />Pipe, corrugated metal (CMP) - 18 in. diameter pipe <br />50 <br />If <br />$ <br />8.67 <br />$ <br />433.50 <br />1.5 <br />Pipe, corrugated metal (CMP) - 18 in. diameter pipe <br />50 <br />If <br />$ <br />8.67 <br />$ <br />433.50 <br />2 <br />Pipe, corrugated metal (CMP) - 24 in. diameter pipe <br />50 <br />If <br />$ <br />11.89 <br />$ <br />594.50 <br />page <br />subtotal= <br />$ <br />255,075.35 <br />16,660 <br />441 <br />$ <br />3,426.01 <br />cost adusted for location: = direct cost total'1.057 <br />$ 796,278.33 <br />direct cost total <br />$ <br />753,338 <br />