Project Identification
<br />Task #: 2
<br />Date: 412912010
<br />User: jhb
<br />Permitting action: New Application
<br />Task description: Demolish structures at South facilites, remove materials and debris
<br />STRUCTURE or ITEM DESCRIPTION
<br />(Dimensions in ft or cf unless noted)
<br />15. Fueling stations 2 x 37.5 75
<br />16. Covered storage 5 buildings
<br />a. west of portals
<br />100 X
<br />30
<br />b. South of portals
<br />200 x
<br />50
<br />c. South of portals
<br />300 X
<br />50
<br />d. South of portals
<br />250 x
<br />50
<br />e. North of portals
<br />100 X
<br />30 x
<br />f. concrete pylons
<br />3.14 x
<br />5 x
<br />17. Oil, MgCl,propane & liquids 37 X 112.5 x
<br />18. Powder magazines 2 x 18.75 X
<br />19. Remove Culverts
<br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hai
<br />SC -1 (HR A -2)
<br />60 x
<br />SC -2 (HR D)
<br />188 X
<br />SC -3
<br />113 x
<br />SC-4
<br />80 x
<br />SC -5
<br />94 X
<br />SC -6
<br />94 x
<br />SC -7
<br />50 x
<br />SC -8
<br />75 x
<br />SC -9
<br />50 x
<br />18A
<br />50 x
<br />52A
<br />40 x
<br />53A
<br />40 x
<br />54A
<br />50 X
<br />55A
<br />50 x
<br />56A
<br />50 X
<br />59A
<br />50 x
<br />64A (no dia. given -est.)
<br />50 x
<br />20. costs for concrete disposal =M104 X $7.77/CY
<br />Page 3 of 3
<br />Agency or organization name: Colorado Division of Minerals and Geology
<br />Permit/job#: C2009 -87
<br />Abbreviation:
<br />Filename: CAjhb1TEAM1Peabody Sage Creek Mine1RCE1C2009 -087
<br />Source of unit costs: 2010 RS Means
<br />CIRCES DEMOLITION MENU SELECTION
<br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. ha
<br />QUANTITY
<br />5,625
<br />Last unit cost update: 2010
<br />UNIT UNIT COST TOTAL COST
<br />cf $ 0.27 $ 1,519
<br />20
<br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hai
<br />60,000
<br />556
<br />cf
<br />$ 0.27
<br />$ 16,200
<br />20
<br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hal
<br />200,000
<br />1,852
<br />cf
<br />$ 0.27
<br />$ 54,000
<br />20
<br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hai
<br />300,000
<br />2,778
<br />cf
<br />$0.27
<br />$ 81,000
<br />20
<br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hal
<br />250,000
<br />2,315
<br />cf
<br />$ 0.27
<br />$ 67,500
<br />15
<br />Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hai
<br />45,000
<br />417
<br />cf
<br />$ 0.27
<br />$ 12,150
<br />92
<br />Demo. and on -site disposal in existing pit, 1.5 ft. x 2 ft. - Max. 200 ft. push
<br />460
<br />Pipe, corrugated metal (CMP) - 24 in. diameter pipe
<br />51 If
<br />$ 12.31
<br />$ 5,663
<br />20
<br />Remove sludge, water, and rem. product from tank - 3,000 to 5,000 gal.
<br />1
<br />2
<br />ea.
<br />$ 221.00
<br />$ 221
<br />9 X
<br />8 Bldg. demo. and on -site disposal in existing pit or cut - Max. 10,000 ft. hai
<br />2,813
<br />26
<br />cf
<br />$ 0.270
<br />$ 759
<br />2
<br />Pipe, corrugated metal (CMP) - 24 in. diameter pipe
<br />60
<br />If
<br />$
<br />11.89
<br />$
<br />713.40
<br />2
<br />Pipe, corrugated metal (CMP) - 24 in. diameter pipe
<br />188
<br />If
<br />$
<br />11.89
<br />$
<br />2,235.32
<br />2
<br />Pipe, corrugated metal (CMP) - 24 in. diameter pipe
<br />113
<br />If
<br />$
<br />11.89
<br />$
<br />1,337.63
<br />2
<br />Pipe, corrugated metal (CMP) - 24 in. diameter pipe
<br />80
<br />If
<br />$
<br />11.89
<br />$
<br />951.20
<br />2 x
<br />2
<br />Pipe, corrugated metal (CMP) - 24 in. diameter pipe
<br />94
<br />If
<br />$
<br />11.89
<br />$
<br />2,235.32
<br />2
<br />Pipe, corrugated metal (CMP) - 24 in. diameter pipe
<br />94
<br />If
<br />$
<br />11.89
<br />$
<br />1,117.66
<br />2 x
<br />2
<br />Pipe, corrugated metal (CMP) - 24 in. diameter pipe
<br />50
<br />If
<br />$
<br />11.89
<br />$
<br />1,189.00
<br />2 x
<br />2
<br />Pipe, corrugated metal (CMP) - 24 in. diameter pipe
<br />75
<br />If
<br />$
<br />11.89
<br />$
<br />1,783.50
<br />2 X
<br />2
<br />Pipe, corrugated metal (CMP) - 24 in. diameter pipe
<br />50
<br />If
<br />$
<br />11.89
<br />$
<br />1,189.00
<br />1.5
<br />Pipe, corrugated metal (CMP) - 18 in. diameter pipe
<br />50
<br />If
<br />$
<br />8.67
<br />$
<br />433.50
<br />1
<br />Pipe, corrugated metal (CMP) - 12 in. diameter pipe
<br />40
<br />If
<br />$
<br />6.87
<br />$
<br />274.80
<br />1
<br />Pipe, corrugated metal (CMP) - 12 in. diameter pipe
<br />40
<br />If
<br />$
<br />6.87
<br />$
<br />274.80
<br />1.5
<br />Pipe, corrugated metal (CMP) - 18 in. diameter pipe
<br />50
<br />If
<br />$
<br />8.67
<br />$
<br />433.50
<br />1.5
<br />Pipe, corrugated metal (CMP) - 18 in. diameter pipe
<br />50
<br />If
<br />$
<br />8.67
<br />$
<br />433.50
<br />1.5
<br />Pipe, corrugated metal (CMP) - 18 in. diameter pipe
<br />50
<br />If
<br />$
<br />8.67
<br />$
<br />433.50
<br />1.5
<br />Pipe, corrugated metal (CMP) - 18 in. diameter pipe
<br />50
<br />If
<br />$
<br />8.67
<br />$
<br />433.50
<br />2
<br />Pipe, corrugated metal (CMP) - 24 in. diameter pipe
<br />50
<br />If
<br />$
<br />11.89
<br />$
<br />594.50
<br />page
<br />subtotal=
<br />$
<br />255,075.35
<br />16,660
<br />441
<br />$
<br />3,426.01
<br />cost adusted for location: = direct cost total'1.057
<br />$ 796,278.33
<br />direct cost total
<br />$
<br />753,338