Laserfiche WebLink
• <br />NORTH <br />AMERICAN <br />GREEN <br />EROSION CONTROL Products <br />Guaranteed SOLUTIONS <br />14649 HIGHWAY 41 NORTH <br />EVANSVILLE, IN 47725 <br />500- 772 -2040 <br />www.nogreen.com <br />CHANNEL INSTALLATION <br />— 125 CM) <br />1. PREPARE WHEN USING CELL-0— INSTA LLING DO NO SEED AREA. PRO CELL ( OE SEED MUST BE � PPER SIDE DOWN. LIME. FERTILIZER, AND SEA. <br />2. EXTENDED BEYOND THE UP—SLOPE POR710N TRENCH- A HOR 6 THE 1 RECP'3 WITH A ROW OF WIDE OXM N THE <br />BEGIN AT THE TOP OF THE RECP's BACK E TRENCH. BACKFILL A ND COMAPC THE <br />SECURE RECP's OVER COMPACTED SOILSWRH TO A ROW OF STAPLES /STAKES SPACED APPROXIMATELY 12 PORTION <br />(30 CM) <br />OF <br />ACROSS THE WIDTH OF THE RECP's. OF CHANNEL RECP's WILL UNROLL <br />3 RECP's M ST BE FASTENED TO A SOIL SURF CE PLACING STAPLES /STAKES IN PPROPRIAIE AS SHOWN IN E SPIF GUIDE <br />WHEN USING THE DOT SYSTEM", STAPLES /STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. <br />4. PLACE CONSECUTIVE RECP's END OVER END (SHINGLE STYLE) WITH A 4' — 6' (10 CM —15 CM) DVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4' (10 CM) <br />PART AND 4 00 CM) ON CENTER TO SECURE RECP's. <br />5. FULL LENGTH EDGE OF RECP's AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STPI.ES /STAKES APPROXIMATELY 12' (30 CM) APART IN A 6' (15 C. <br />DEEP X 6' (15 CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. <br />6. ADJACENT RECP's MUST BE OVERLAPPED APPROXIMATELY 2' — 5' (5 CM —12.5 CM) (DEPENDING ON RECP's TYPE) AND STAPLED. <br />7 IIN HIG FLOW HA PART AND 4' (10 A ON CENTER GIVER R ECOMMEN DED <br />WIDTH AT 30 T 40 FOOT (9 M — 12 M) INTERVALS USE A DOUBLE ROW Of STAPLES . <br />8. THE TERMINAL NO F 'T E RECP's MUST BE <br />COMPACT THE TRENCH ANCHOR WITH STAPLING. OF STAPLES/STAKES APPROXIMATELY 12' (30 CM) PART IN A 6' (15 CM) DEEP X 6' (15 CM) <br />E T <br />NOTE <br />• IN LOOSE SOIL CONDIT10N5, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6' (15 CM) MAY BE NECESSARY TO PROPERLY ANCHOR . THE RECP's. <br />• <br />REV. 01/05 <br />NOTE <br />• HORIZONTAL STAPLE SPACING SHOULD BE ALTERED <br />A <br />B <br />CRITICAL POINTS <br />IF NECESSARY TO ALLOW STAPLES TO SECURE THE <br />POINTS ALONG THE CHANNEL SURFACE. <br />C <br />A. OVERLAPS AND SEAMS <br />CRITICAL <br />B. P WATER LINE <br />C . CHANNEL <br />OR OR I L <br />STAKE E 5 SOIL NGTHS GREATER THAN 6'(15 cm) MAY <br />SLOPE VERTICES <br />BE NECESSARY TO PROPERLY ANCHOR THE RECP a. <br />• <br />REV. 01/05 <br />