Colowyo C-1981-019 <br /> 18 May 10 <br /> Pg 5/7 <br /> Backfilling and Grading (cont.): West Pit (cont) - As stated, Colowyo does need to fix <br /> these areas but the use of a small dozer would create more disturbance/damage <br /> than it would fix. Colowyo should consider repairing these rill areas by hand early in <br /> the growing season. Colowyo has repaired the contour ditches that were breached <br /> during the runoff this spring. All of the backfilled areas were stable, with no cracking, <br /> settling or slumping observed. Overall, the 2009 West Pit reclamation looks very <br /> good. **See pictures at the end of this report.** <br /> - The 2009 East Pit reclamation area was also mostly dry at the time of the inspection. <br /> This area, too, has held up very well over the winter and spring runoff season. The <br /> area south of the Final East Pit Ditch had some minor rilling. There are two areas <br /> where the rilling is more extensive, although the rills are no more than 4" deep. These <br /> areas should be repaired by hand, to avoid the damage caused by placing larger <br /> equipment on the reclamation. The "Y" area between the Final East Pit Ditch and <br /> the North Tributary, East Pit Ditch has minor rilling. These rills are all less than 4" deep. <br /> These rills will need to be repaired. The area below the Final East Pit Ditch and the <br /> North Tributary, East Pit Ditch had almost no rilling. This area held up very well through <br /> the spring runoff. Colowyo should continue to monitor this area. The flat area just <br /> north of the North Tributary, East Pit Ditch had very minor rilling, with the rills measuring <br /> less than 4" deep. Colowyo should repair all rills in this area as necessary. The slope <br /> immediately south of the Prospect Ditch had some rilling above the upper-most <br /> contour ditch and no rills below the ditch. These rills were all less than 4" deep. The <br /> area to the north of the Prospect ditch had some larger rills (6") above the upper- <br /> most contour ditch and no rills below this point. The rills in this area appear to be <br /> directly related to the 2007-2008 reclamation area above it that has extensive <br /> gullying. Colowyo will need to repair the rills in the 2009 reclamation area and also <br /> repair the 2007-2008 gully area. While the 2009 area can be repaired by hand, the <br /> 2007-2008 area will require extensive work, possibly including topsoil stripping prior to <br /> the repairs and replacement and reseeding following the repairs. There did not <br /> appear to be any settling, cracking or slumping in any of the 2009 East Pit <br /> reclamation areas. These areas are overall in good condition. **See pictures at the <br /> end of this report.** <br /> - Colowyo continues to use the final cut of the Section 16 Pit as the dump for material <br /> from the South Taylor Pit (from the truck/shovel and excavator/shovel operations). <br /> he backfill is being constructed by end dumping the material in approximately 50- <br /> foot lifts. Colowyo plans to continue using the Section 16 Pit area as their dump until <br /> it is backfilled to the post-mining topography. **See pictures at the end of this <br /> report.** <br /> General Mine Plan Compliance: - The 101 dragline was back on the edge of the East <br /> Pit highwall. No additional reclamation has been completed on the East Pit highwall <br /> and Colowyo has shut off power to the 101 . <br /> - The 102 dragline was down for scheduled maintenance. <br /> - The 103 dragline was in the West Pit removing F-Seam overburden. <br /> - The 114 shovel operation was working on removing B1-Seam overburden in the <br /> South Taylor box-cut area. **See pictures at the end of this report.** <br />