My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-02_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-06-02_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:40 PM
Creation date
6/2/2010 10:29:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
6/2/2010
Doc Name
Response to Division's Preliminary Adequacy Report
From
Colowyo Coal Company
To
DRMS
Type & Sequence
TR81
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rule 4.09.2 - Excess Spoil <br />16. In Colowyo's response to the Division's incompleteness question 1 (the Division's 14 <br />September 2009 Incompleteness Letter) a chart is included that shows permanent and <br />temporary fill volumes for the East and West Taylor Fills and the temporary overburden <br />stockpiles. These tables are inaccurate. A reconstruction of the temporary fill volumes <br />(from the 7 December 2009 Colowyo response letter) is shown below. <br />Temporary Fill <br />Volumes <br />PR-02 <br />TR-81 <br /> <br />Section 16 Fill 0 11,969,000 <br />West Taylor Fill 6,091,000 <br />East Taylor Fill 46,213,000 <br />Total 52,304,000 11,969,000 <br />With the permitting of South Taylor (PR-02) Colowyo permitted two temporary overburden <br />stockpiles, TS East and TS West. TS East was permitted to sit on Section 16 reclamation, <br />east of the final cut of the Section 16 Pit, and was permitted to contain approximately <br />13,300,000 cubic yards of overburden. TS West was permitted to sit on the East Taylor Fill <br />and contain approximately 29,800,000 cubic yards of overburden. No temporary <br />overburden was permitted for storage on the West Taylor Fill or in the final cut of the <br />Section 16 Pit. <br />Original PR-02 Volume <br />TS East 1 11,846,426 <br />TS East 2 1,469,489 <br />Total 13,315,915 <br /> <br />TS West 1 10, 520,175 <br />TS West 2 19,329,024 <br />Total 29,849,199 <br /> <br />Total PR-02 <br />Spoil <br />43,165,114 <br />The chart Colowyo included in the 7 December 2009 response letter does not correctly list <br />the original permitted volumes or locations for temporary overburden. Additionally, the <br />chart shows that in TR-81 there is no proposed overburden temporarily stockpiled on the <br />East Taylor or West Taylor Fills. This information does not match the information shown on <br />Map 45 - South Taylor Fill. Cross-sections A-A' and E-E' clearly show a large volume of <br />temporary overburden stockpiled on the East Taylor Fill. Cross-sections 13-13' and D-D' <br />clearly show temporary overburden stockpiled on the West Taylor Fill. Cross-section E-E' <br />clearly shows temporary overburden stockpiled in the final cut area of the Section 16 Pit.
The URL can be used to link to this page
Your browser does not support the video tag.