Laserfiche WebLink
The proposed shaft construction site is less than 100 feet measured horizontally of the outside right-of- <br />way line of Terror Creek Road. The area is about 1.3 miles south of where the USDA-FS boundary <br />crosses Terror Creek Road. A public hearing for the purpose of determining whether the interests of <br />the public and affected landowners will be protected may be requested by contacting the Division in <br />writing within 30 days after this publication. Any such hearing will be held in the locality of the proposed <br />mining operation.