My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-21_REVISION - C1981010 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2010-05-21_REVISION - C1981010 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:14 PM
Creation date
5/24/2010 8:41:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
5/21/2010
Doc Name
2010 Midterm Review Cost Estimate (Memo)
From
Jason Musick
To
Rob Zuber
Type & Sequence
MT6
Email Name
JDM
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />CIRCES Cost Estimating Software <br />DIRECT COST SUMMARY FORM <br />Date : 04-Mar-2010 Permit or job no. C-1981-010 Site : Trapper Mine <br />User : JDM Abbreviation : none State :Colorado <br />Task : 00C Filename : C010-00C County :Moffat <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or job action :2010 Midterm Review <br />Task description : Summary of Road Ripping and Impoundment Regrade Tasks 11 TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br /> <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />063 -Rip BC Walk Road ripper 4 2.2 $Z331 <br />064 -Rip D Pit Haulroads (D1, D3, D4, D5, and Main) ripper 4 8.41 $8,734 <br />065 -Rip West Ash Haulroads (West Ash, West Ash 1, and West Ash2) ripper 4 5.9 $6,216 <br />066 -Rip LOM Haulroads (F2, F2-G5) ripper 4 8.7 $9,107 <br />067 -Rip A Pit Haulroads (Middle A and North A) ripper 4 6.4 $6,683 <br />068 -Rip F Pit Haulroads (FMain, F0, F1, F3, F4, F01) ripper 4 5.3 $5,595 <br />069 -Rip Middle Z and F2 Haulroads ripper 4 2.2 $2,331 <br />070 -Rip East Middle Z and Z3 Haulroads ripper 4 2.3 $2,393 <br />071 -Rip EF Haulroad ripper 4 0.5 $559 <br />072 -Rip East A Haulroad (East A and East A Split) ripper 4 2.9 $3,077 <br />073 -Rip G5 Haulroad ripper 4 0.9 $932 <br />074 -Rip Access Roads (Tasks 042-061) ripper 4 3.11 $3,233 <br />075 -Rip K-Pit Haulroads (Wain, K1, K2, K3) ripper 4 2.1 $2,207 <br />076 -Rip K-Pit Haulroads (TR-106) ripper 4 3.3 $3,503 <br />080 -Regrade Coyote Impoundment dozer 1 577.0 $148,083 <br />081 -Regrade Middle Pyatte Impoundments (1, 2, 3) dozer 1 51.7 $13,267 <br />082 -Regrade Far East Buzzard Impoundment dozer 1 0.5 $145 <br />083 -Regrade Sage IMpoundments dozer 1 18.9 $4,851 <br />084 -Regrade West Hoerse Impoundment dozer 1 3.51 $902 <br />085 -Regrade Impoundment H dozer 1 7.2 $1,868 <br />086 -Regrade INdustrial Wast Pond dozer 1 7.4 $1,916 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 721.2 $227,933
The URL can be used to link to this page
Your browser does not support the video tag.