Laserfiche WebLink
PROJECT IDENTIFICATION <br />CIRCES Cost Estimating Software <br />DIRECT COST SUMMARY FORM <br />Date : 08-Jul-2009 Permit or job no. C-1981-010 Site : Trapper Mine <br />User : JDM Abbreviation none State : Colorado <br />Task : 006 Filename : C010-008 County :Moffat <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or job action :2010 Midterm Review <br />Task description : Summary of Road Regrade Tasks <br /> <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />030 -Regrade BC Road dozer 4 35.7 $36,676 <br />031 -Regrade D-Pit Roads dozer 4 130.2 $133,720 <br />032 -Regrade West Ash Roads dozer 4 90.81 $93,211 <br />033 -Regrade LOM Roads (F2, F2-G5) dozer 4 139.3 $143,007 <br />034 -Regrade A Pit Roads (Middle A and North A) dozer 4 93.9 $96,429 <br />035 -Regrade F Pit Haul Roads (FO-1, FMain, F0, F1, F3, F4) dozer 4 78.8 $80,946 <br />036 -Regrade Middle Z/F2 Haul Roads dozer 4 33.0 $33,954 <br />037 -Regrade East Middle Z and Z3 Haul Roads dozer 4 33.8 $34,769 <br />038 -Regrade EF Haul Road dozer 4 7.9 $8,149 <br />039 -Regrade East A Haul Roads (East A and East A Split) dozer 4 43.4 $44,547 <br />040 -Regrade G5 Haul Road dozer 4 13.2 $13,581 <br />041 -Regrade K Pit Haul roads (KMain, K1, K2, K3) dozer 4 31.2 $32, 053 <br />042 -Regrade Mine Access Road dozer 4 21.4 $22,011 <br />043 -Regrade Explosive Storage Access Road dozer 4 3.2 $3,335 <br />044 -Regrade No Name Access Roads (#2 and #4) dozer 4 6.5 $6,737 <br />045 -Regrade Potable Water Well Access Road dozer 4 1.6 $1,668 <br />046 -Regrade West Pyaett Access Roads (1 and 2) dozer 4 6.5 $6,670 <br />047 -Regrade Middle Pyeatt Access Roade (1, 2, 3) dozer 4 6.01 $6,170 <br />048 -Regrade East Pyaett Access Roads (1, 2, 3) dozer 4 7.9 $8,171 <br />049 -Regrade Grouse Access Road dozer 4 4.1 $4,269 <br />050 -Regrade West Flume Access Road dozer 4 2.4 $2, 501 <br />051 -Regrade East Flume Access Road dozer 4 2.4 $2, 501 <br />052 -Regrade Deal Access Roads dozer 4 10.2 $10,505 <br />053 -Regrade Horse Access Roads (Horse and Horse 1) dozer 4 7.9 $8,171 <br />054 -Regrade West Horse Access Road dozer 4 11.7 $12,006 <br />055 -Regrade Middle Flume Access Roads (1, 2, 3) dozer 4 6.271 $6,437 <br />056 -Regrade Oak Access Roads dozer 4 3.0 $3,168 <br />057 -Regrade Sage Access Roads dozer 4 4.0 $4,169 <br />058 -Regrade Johnson Access Road dozer 4 10.0 $10,339 <br />059 -Regrade Elk 1 Access Road dozer 4 2.4 $Z501 <br />060 -Regrade East Buzzard Access Road dozer 4 2.4 $2,501 <br />061 -Regrade Far East Buzzard Access Road dozer 4 2.4 $Z501 <br />062 -Regrade K-Pit Haul Roads (TR-106) dozer 4 49.2 $50,523 <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 904.01 $927,896