Laserfiche WebLink
Mr. Eric Scott <br />Division of Reclamation, Mining, and Safety <br />- May 18, 2010 <br />Page 2 of 4 <br />'for the' site, approved by the Office, and a reclamation plan was formulated. As stated in <br />Exhibit E of the Reclamation Permit Application, the final reclamation plan for this portion of. <br />the site was to return the disturbed ground to pastureland,and, to match the reclaimed grade of the <br />property to the pre-existing grade. Consistent with Exhibit- E, .backfilling of the mined pit and <br />grading activities were concurrent with mining- operations: <br />As .listed below, reclamation-; of the site has complied with additional subsections of the- <br />Reclamation Performance Standards. <br />3.1:5 ' Materials Handling <br />To meet requirements, the following activities were performed. <br />• Grading created a_ final topography appropriate for the permitted final land use, <br />pastureland. <br />• Backfilling was performed with adequate compaction for stability. No structures are <br />planned for the site, so compaction testing was not necessary: <br />• No mining highwalls were left on the site and all slopes were graded to control potential <br />erosion and siltation. <br />Grading of all slopes was done as mining progressed. <br />• No refuse, acid-forming, or toxic producing.materials were mined-or produced on the site. " <br />• No drill or auger holes were part of the mining operations and no adits or shafts were <br />created. <br />• No significant slopes were left on the site: Slopes are consistent with the. pre-existing <br />topography and appropriate for use as pastureland. <br />• The reclamation choice for. pastureland may require that the area be plowed, planted and <br />mowed. The area is graded so farm machinery can traverse the, area when needed. <br />• Structural fill was not used to back-fill the. excavated pit. <br />• Material that could" potentially cause unauthorized releases -of, pollutants to the surface <br />drainage system was not mined or disposed of within the affected area. <br />• No unauthorized release of pollutants to groundwater .occurred from materials mined or <br />handled within the permit area. <br />All backfilling and grading was done as -mining progressed. Final grading was completed in <br />the surnmer of 2005 after the completion of mining activities. Revegetation at - the site was <br />performed in Fall 2005. <br />3.1.6 Water --General Requirements <br />Disturbances to the prevailing hydrologic-balance of the affected land and surrounding area were <br />minimized. <br />• The operator has complied.with applicable Colorado water -laws and regulations <br />governing injury to existing water rights.