Laserfiche WebLink
General Mine Plan Compliance PDC oil and gas company has not provided CEC with proposed dimensions of drill pads or <br /> staked the road corridor location. <br /> CEC continues to dispose of ash in Pit B. CEC has returned to placement of ash on the lower lift (see photo below). CEC <br /> will continue to place ash on the lower lift until they reach the northern extent of the B pit. During the inspection an ash <br /> truck placed an ash load in the pit. No problems were observed with the pit or the ash disposal area. <br /> B Pit(facing cast) <br /> Fish At Wildlife: An owl nest, adult owls,and a baby owl were observed near the north border as was a deer. A small turtle <br /> was observed near the NW comer. <br /> Revenetation: Parcels 29, 30,and 31 were visited by foot. Some grass was observed in Parcel 31, and some mulch was still <br /> evident. Parcel 29 looked good and parcel 30 looked even better. Mr. Kipp stated that the difference was due to the <br /> practice of putting the B horizon soil on top of horizon A at Parcel 30. Photos of these parcels are included below. <br /> Parcel 25 was visited by foot and CEC staff pointed out problems with growing grass, especially in the southwest quadrant <br /> of the parcel. <br /> Page-4--M_7_Pages.(date) 511=101inllials) rdz <br />