Laserfiche WebLink
Contractor Mob/Demob (5%) <br />Overhead (15%) <br />Administrative (5%) <br />Total Proposed Financial Warranty <br />Disturbed Acreage <br />Financial Warranty per Acre <br />Wetlands Reclamation Estimate <br />Wetland Mitigation <br />Item Description <br />Site Grading-Earthwork <br />Soil/Seed Bed Prep <br />Soil Amendments <br />Outlet Water Control Structure <br />Wetland Shrub/Sod Transplant (harvest & place) <br />Wetland Seeding <br />Wetland plugs (10cc, 2' spacing) <br />Wetland Shrubs (5-gallons, 10' spacing) <br />Construction Design building Coordination and <br />Surveying <br />Access and Upland Reclamation <br />BMPs - Water Control <br />Mobilization/Demobilization <br />Year 1 -Monitoring and Maintenance <br /> Option 1 * <br /> Unit <br />Unit Cost Quantity Subtotal <br />Acre 12,000 0.4 4,800 <br />Acre 2,150 0.4 860 <br />Acre 1,850 0.4 740 <br />Each 3,200 1 3,200 <br />Acre 7,500 0.4 3,000 <br />Acre 2,000 0.4 800 <br />Acre 24,750 0.4 9,900 <br />Acre 15,250 0.4 6,100 <br />Each 25,000 0.5 12,500 <br />Acre 1,600 0.4 640 <br />Each 5,000 1 5,000 <br />Each 5,000 1 5,000 <br />Each 20,000 0.5 10,000 <br />EXHIBIT L <br />14,618 <br />43,852 <br />14,618 <br />$ 365,438 <br />60 acres <br />$6,091 <br />Option 2** <br />Quantity Subtotal <br />2.1 25,200 <br />2.1 4,515 <br />2.1 3,885 <br />1 3,200 <br />2.1 15,750 <br />2.1 4,200 <br />2.1 51,975 <br />2.1 32,025 <br />1 25,000 <br />2.1 3,360 <br />1 5,000 <br />1 5,000 <br />1 20,000_ <br />Total Cost 62,540 199,110 <br />'Option 1 is the minimum wetland mitigation required for the Vendette <br />Channel <br />"Option 2 is the maximum potential wetland mitigation required pending Army Corps determination of the area marked "Potential Wetland" <br />2