Laserfiche WebLink
62. According to subsection 2.05.6(6)(c)(i) on page 2.05-144, the subsidence monitoring program for <br />the Bruce Park dam and Bruce Park landslide will be suspended. Text regarding the monitoring <br />program has also been struck through on page 2.05-149. However, page 2.05-158 appears to <br />retain language regarding monitoring of the Bruce Park landslide. Please review the various <br />monitoring plans for the Bruce Park Dam and Landslide and verify that the permit text is internally <br />consistent regarding the monitoring efforts proposed. <br />63. Because BRL is no longer proposing to mine within one mile of the Bruce Park Dam and Terror Creek <br />Reservoir, no material damage due to the Bruce Park landslide is anticipated. Therefore, the Division <br />requests that Section 2.05.6(6)(b)(iii) on revised page 2.05-143 be revised to reflect this change. The <br />Division also requests that a statement be made in this same section that, should mining be proposed <br />within one mile of the Bruce Park Dam and Terror Creek Reservoir, the subsidence control plan will <br />be reactivated. The same reference should also be added to the appropriate sections of 2.05.6(6) which <br />now discuss the subsidence control plan, rather than deleting such text. If BRL wants to continue <br />monitoring of the Bruce Park Dam and the Terror Creek Reservoir on a voluntary basis, an appropriate <br />explanation should be placed into the text as well, such as on revised page 2.05-158. <br />Section 2.10 Maps and Plans <br />64. Please revise the currently approved Maps 11, 14 and 27-B to show that the new permit boundary <br />extends to the west. <br />Section 3.02.2 Determination of Bond Amount <br />65. Attached is the Division's reclamation cost estimate for PR-12. The estimate is comprised of eight <br />tasks (a summary sheet and tasks 251-257) and represents an increase in liability of $45,039.00. This <br />estimate included the transfer of three exploration holes (BRL-1-03-01, BRL-1-08-01 and BRL-1-08- <br />04), drill pads, light use roads, topsoil replacement and reseeding from the Bowie No. 1 Mine permit <br />into the Bowie No. 2 Mine permit. The original Bowie No. 1 Mine revisions were TR-41 and TR-49. <br />The Division's estimate is more than the one submitted by BRL because the Division updated the <br />costs for the tasks from TR-41 and TR-49 in the PR-12 estimate. Please inform the Division in writing <br />whether or not this estimate is acceptable to BRL. <br />Section 4.20 Subsidence Control <br />66. Under Rule 4.20.2, please provide documentation that owners of property, including structures, and <br />residents within the area above the underground workings and adjacent areas have received the mining <br />schedule as described in Rules 4.20.2(1), (2) and (3). <br />General Comments Regardinjz Maps <br />67. Map 07 - Geology <br />A. The Legend provides a symbol for "B-Seam Projected" workings, but these workings <br />9