Laserfiche WebLink
52. The information on revised page 2.05-120 and on Map 9 shows that there is no upstream monitoring <br />site for Steven's Gulch. An upstream monitoring site is needed to compare with the monitoring <br />information gathered at downstream monitoring site SW-5. Please propose a Steven's Gulch upstream <br />monitoring site or explain why such a site is impractical. <br />53. A discussion of the Bruce Park Dam begins on page 2.05-136. The permit text continues to refer <br />to the Bruce Park Dam, while the various permit maps use the name "Terror Creek Reservoir". In <br />the interest of clarity, please consider adding, "and Bruce Park Dam" to the feature on the various <br />maps and/or modify the permit text to explain that the reservoir formed by the Dam is the Terror <br />Creek Reservoir. <br />54. Please explain why the creek in Steven's Gulch is not included along with Hubbard Creek and Terror <br />Creek in the discussions on revised pages 2.05-136 and 2.05-142. <br />55. Discussion of the Bruce Park landslide begins at the top of page 2.05=137. While the feature is <br />analyzed in detail in the referenced Yeh study, the location of the landslide is not apparent on Map <br />06 - Geological Hazards. Please modify Map 06 to indicate the location of the Bruce Park <br />landslide feature. <br />56. The third paragraph on page 2.05-137 describes the Hubbard Creek road. Please update the text to <br />incorporate the new Hubbard Creek Fansite. <br />57. On revised page 2.05-137, BRL states that the Stevens Gulch road will be subsided and that the <br />road is protected where severe damage would occur by limited extraction. The Division does not <br />agree that Stevens Gulch road is protected by limited extraction areas from activities as proposed <br />under PR-12. Permit text on page 2.05-141 accurately describes the subsidence consequences and <br />mitigation for the Stevens Gulch road. Please correct the permit text on page 2.05-137. <br />58. The 3rd paragraph on page 2.05-140 refers to the potential impact to the Bruce Park landslide of <br />mine-induced seismic activity. Please consider modifying this paragraph to include a reference to <br />the Yeh 2006 study. <br />59. Please add permit text discussion at the bottom of page 2.05-142 regarding the subsidence <br />consequences and mitigation to any loss of surface water flow in Stevens Gulch. <br />60. The second paragraph on page 2.05-143 seems to be internally contradictory: "The sandstone <br />ledge that forms Dove Cave could collapse. However the sandstone ledge will not be damaged <br />since it is not within the area to be affected by mining." (Emphasis added) Please verify that the <br />text reads as it is intended to read, or change as appropriate. <br />61. The 3rd paragraph on page 2.05-151 refers to a limited extraction zone that has been established <br />where the 1 West Mains cross under Terror Creek and the WAPA transmission line. The <br />following paragraph reiterates the WAPA zone. Maps 14-B and 27 do not appear to have been <br />modified to illustrate the limited extraction zones described. Please revise Maps 14-B and 27 to <br />depict the limited extraction zones for the 1 West Mains. <br />8