Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Pertnittee/ Permit Field Visit C Continuation Page <br />Percnn.._. TRAPPER MINING, INC. Number C-010-81 Date }/20/2010 28. Performance Standard Categories <br />Codes: 1=Compliance, 2=Noncompliance, 3=Not Planned, 4=Not Started, 5=Noncompliance Identified Elsewhere, 6=Previously. Cited <br />A. Administrative <br />I.'- . Mining within Valid Permit <br />2. T Mining within Bonded Area <br />3. _ Terms & Conditions of Permit <br />4. Liability Insurance <br />_ <br />5., Ownership and Control <br />.6. Temporary Cessation <br />_ <br />7. AML Rec. Fees -- Non-Respondent <br />8. _ AML Rec. Fees -- Failure to Pay <br />B. Hydrologic Balance <br />1. 1 Drainage Control <br />2. Inspections & Certifications <br />3. Siltation Structures <br />4. Discharge Structures <br />5. 1 Diversions <br />6. Effluent Limits <br />7. Ground Water Monitoring <br />8. - Surface Water Monitoring <br />9. Drainage -- Acid-Toxic Materials <br />10. Impoundments <br />11. Stream Buffer Zones <br />C. Topsoil & Subsoil <br />1. Removal <br />2. Substitute Materials <br />3. Storage and Protection <br />4. 1 Redistribution <br />D:" Backfilling & Grading <br />1. Exposed Openings <br />2. 1 Contemporaneous Reclamation <br />3. 1 Approximate Original Contour <br />4. 1 - Highwall Elimination <br />5. 1 Steep Slopes (includes downslope) <br />6. 1 Handling of Acid & Toxic Materials <br />7. 5 Stabilization (rills and gullies) <br />E. Excess Spoil Disposal <br />1. Placement <br />2. Drainage Control <br />3. Surface Stabilization <br />4. Inspections & Certifications <br />F. Coal Mine Waste <br />(Refuse Piles/Impoundments) <br />1.. Drainage Control <br />2. Surface Stabilization <br />3. Placement Ge <br />4. Inspections and Certifications Peff <br />5. Impounding Structures Cat <br />G. Use Of Explosives <br />1. Blaster Certification <br />2. Distance Prohibitions <br />3. Blast Survey/Schedule <br />4. Warnings & Records <br />5. Control of Adverse Effects <br />H. 'Subsidence Control Plan <br />1. Roads <br />1. Road Construction <br />2. Certification <br />3._ Drainage <br />4._ Surfacing and Maintenance <br />5. Reclamation <br />J. Signs & Markers <br />1._ Signs <br />2. Markers <br />K. _Distance Prohibitions <br />L. Revegetation <br />1._ Vegetative Cover <br />2. Timing <br />M. _Postmining Land Use <br />N. Other <br />neral <br />ormance <br />agory <br />1) <br />2 <br />3) <br />Performance Standard Catagories E. Excess Spoil Disposal ...........................................(816/817.71-74) <br />30 CFR Counterpart 1. Placement .................................................................... .......................71(e) <br />Administrative ......................................................................... <br />A 2. Drainage Control ....................................................... .........................71(f) <br />. <br />. <br />.............................. <br />Valid Pennit <br />1 ....................................... 773.11 3. Surface Stabilization .................................................. ......................... 71(g) <br />.............. <br />. <br />. <br />2. Mining within Bonded Area ............. ...................................773.11 4. Inspections & Certifications....................................... ........................ 71( <br /> ) <br />3. Terms & Conditions of Permit .......... ...................................773.17 F. Coal Mine Waste (Refuse Piles/Impoundments) .. ...(816/817.81-84) <br />4. Liability Insurance ................................................................800.60 <br />Ownership and Control ......................................................778.13 <br />5 <br />1. <br />Drainage Control ....................................................... <br />........................83(a) <br />. <br />6. Temporary Cessation ......................... .....842.11 (e) & 816/8 17 131 <br />' 2. <br /> <br />3 Surface Stabilization .................................................. <br /> <br />............................ <br />Placement ........................83(b) <br /> <br />........................83(c) <br />7. AML Rec. Fees -- Non-Respondant .........:.....................,87070.15(b) <br />Fees -- Failure to Pay .....................................870.15(a) <br />AML Rec <br />8 . <br />4. ....................................... <br />Inspections and Certifications.................................... ....................... 83(d) <br />. <br />. 5. Impounding Structures ............................................... ...........................84 <br />B. Hydrologic Balance ...................... ................(816/817.41-57) G. <br />................. <br />Use of Explosives............................ <br />.... (816/817.61-68) <br />... <br />1. Drainage Control ..................................................................... 45 <br />2. Inspections & Certifications ............................................. 49(a)(10) <br /> <br />1. <br /> <br />Blaster Certification.................................................... <br /> <br />.......................61(c) <br />3. Siltation Structures ............................ ..........................................46 2. <br />3 Distance Prohibitions ........ ................................................................. 61(d) <br />Blast Survey/Schedule ........ ...............................................................62-64 <br />4. Discharge Structures ........................ <br />......................... <br />Diversions <br />5 ........................................... 47 <br />..........................................43 . <br />4. Warnings & Records ....................................................................... 66 & 68 <br />................ <br />. <br />6. Effluent Limits ............. ......... --....... ............... ........................... 42 5. Control of Adverse Effects ......................................... ........................... <br />. 67 <br />7. Ground Water Monitoring ................ ......................................41(c) H. Subsidence Control Plan ......................................... (817.121-122) <br />8. Surface Water Monitoring ................ .......................................41(e) I. Roads........................... ...........................(816/817.150-151) <br />9. Drainage--Acid - Toxic Materials ..... ......................................41(f) <br />49 <br />1. <br />Road Construction ..................................................... <br />...................... 150(c) <br />10. Impoundments .................................. <br />Stream Buffer Zones <br />11 .......................................... <br />................................. 57 <br />. <br />.. 2 Certification...................................................:........... .....:.................151(,) <br />......................... <br />. . <br />. 3. Drainage .......... ........................................................... .......... 150(b)-151(d) <br />C. Topsoil & Subsoil ...............................................(816/817.22) 4. Surfacing and Maintenanc:e........................................ ..........150(e)-151(d) <br />I. Removal ............................................ ......................................22(a) 5. Reclamation ............................................................... .................... <br />... 150(f) <br />2. Substitute Materials ........................... ......................................22(c) J. Signs & Markers ............................................. ..........(816/817.11) <br />3. Storage and Protection ............................................................22(c) <br />Redistribution ..:........... 22(d) <br />4 <br />1. <br />Signs.......................................................................... <br />........... I I (a),(b),&(c) <br />. 2. Markers ...................................................................... I I(a),(b),(d),(e),&(f) <br />D. Backfilling & Grading ............... ...............(816/817.95-107) K. Distance Prohibitions ...................................... ................. (761.11) <br />1. Exposed Openings .....................816/817.13, 14, 15, & 823.11 & 21 L Revegetation.................................................... . (816/817.111-116) <br />2. Contemporaneous Reclamation ......... <br />3. Approximate Original Contour .......... .........................................100 <br />................................102(a)(1) <br />1. <br />2 <br />Vegetative Cover ....................................................... <br />Timin <br />................ 1 11 & 116 <br />1 13 <br />4. Highwall Elimination ......................... ................................102(,)(2) . g ....................................................................... ........................... <br />5. Steep Slopes (includes downslope) .... ........................................107 M. Postmining Land Use.............................................. (816/817.133) <br />6. Handling of Acid & Toxic Materials .. ....................................102(c) Page 2 Of <br />7. Stabilization (rills and gullies) ........... .......................................95(b) Revised December 4. i99s