Laserfiche WebLink
Tn.0i <br />U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE NG <br />Mine Site Evaluation A 1p?o <br />??`.,?'. <br />State Program <br />1. Permittee/Person 9. Permit Numt; r"' g 10. Permit Type <br /> TRAPPER MINING, INC. C-010-81 PP <br /> 2. Address 11. Field Visit bate 12. Purpose 13. SRA Present <br /> PO BOX 187 04/20/2010 OBI <br />3. City 4. State .: mm - dd - yyyy <br /> <br />Craig CO 14 . Permit Status 15. Site Status 16. Facility Type <br /> <br />A <br />Ap _ADG <br />5. Zip Code 6. Phone Number <br /> 17. OSM Office # 18. CCID # 19. Land Code <br />81626 (970) 826-6100 <br />140 SF <br />7. Operator Name, if Different than Permittee <br /> 20. M.S.H.A ID # 21. State Abrev. 22. County Name <br /> MOFFAT <br />Mine Name <br />8 05-02838 CO <br /> . <br /> 23. AVS Permittee Entity ID Number .24. State Office <br />TRAPPER MINE <br /> 1 090118 1 - I L <br />25. Hours 26. Signature Block 27. Reviewing Official: <br />8.0 a. Permit Review <br /> <br /> 6 <br />5 b. Site Visit Time Signature: Signature: <br /> . Christine Belka 1D # 182 <br />8.0 c. Travel Time <br />Printed Name: Review Date: r" / 0// <br /> mm - dd - yyyy <br />4.0 d. Report Writing Date: 05/05/2010 Is Supplemental MSE Page Used Y/N Y? <br />Permit Type - Item 10 IF = Interim Program, PP = Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR.... Citizen Complaint Referral (non site visit) <br />0xx ,...Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection - Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site., <br />Permit Status - Item 14 AB.... Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(g) <br />ppermitted but not yet disturbed. AB1..Bond Forfeiture: Bond forfeiture officially in process or completed, and. <br />IN....Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) AB2..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR...Bond Release: Reclamation completed and State Regulatory AB3..Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />NA <br />N <br />t A <br />li <br />bl <br />Wh <br />i <br />... <br />o <br />pp <br />ca <br />e: <br />en site <br />s unpermitted. <br />Authority (RA) has released all of the bond (Phase III Release.) <br />Site Status Codes - Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND...No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The RA is pursuing <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX..Coal Exploration: Coal exploration operations TC..Temporary Cessation: The RA has granted performance bond(s), and/or reclama- <br />have started and <br />r <br />h <br />c <br />al mi <br />i <br />o <br />ti <br />ti <br />f <br />i <br />i <br />t t <br />30 CFR 816/ t <br />f f <br />f <br />w <br />e <br />e <br />o <br />n <br />ng <br />pera <br />ons cessa <br />on o <br />ng pursuan <br />m <br />n <br />o <br />ion o <br />or <br />eited site is in progress. <br />have not begun. 817.131(b). FR..Forfeited and Reclaimed: Forfeiture <br />C <br />R <br />AP.. Active <br />oal Producing: Coal surface mining P1...Phase I <br />elease: At least Phase I bond release reclamation completed. <br />activities are occurring. granted for entire permitted area. For interim FO..Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond, <br />facility such as tipple or preparation plant. P2.. Phase II Release: At least Phase 11 bond release WC.Wildcat: Coal mining and reclamation <br />NM..No Mining: The Permit Status is active, site is for the entire permitted area. operations have or are taking place and <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not covered by the <br />mining activity, and site not regraded. the RA has released all bond. required permits from the RA. <br />Facility Type Codes - Item 16 D...Ancillary (Haulroad, Conveyor, and/or Rails) H...Exploration Permits L... Remining site permitted <br />A... Surface E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR785.25 <br />B... Underground F... Loadin Facility and/or Tipple J.Exempt 16 and 2/3 <br />' <br />' <br />C... Preparation Plant G...StockpLs K. <br />. <br />. Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each a enc v's <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including those of affiliates) Page 1 of <br />and wish to comment on the enforcement or compliance activities of OSM, call 1-888-REG-FAIR (1-888-734-3247). Revised December 4, 1998