My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-04_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2010-05-04_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:21 PM
Creation date
5/11/2010 8:09:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
5/4/2010
Doc Name
Adequacy Review (Memo)
From
Marcia Talvitie
To
Joe Dudash
Type & Sequence
PR12
Email Name
JJD
SB1
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C-1996-083 - PR-12 <br />Adequacy Review - MLT <br />04 May 2010 <br />Page 3 of 3 <br />retain language regarding monitoring of the Bruce Park landslide. Please review the various <br />monitoring plans for the Bruce Park Dam and Landslide and verify that the permit text is <br />internally consistent regarding the monitoring efforts proposed. <br />The 3rd paragraph on page 2.05-151 refers to a limited extraction zone that has been established <br />where the 1 West Mains cross under Terror Creek and the WAPA transmission line. The <br />following paragraph reiterates the WAPA zone. Maps 14-B and 27 do not appear to have been <br />modified to illustrate the limited extraction zones described. Please revise Maps 14-B and 27 to <br />depict the limited extraction zones for the 1 West Mains. <br />General Comments regarding Maps <br />Map 07 - Geology <br />• The Legend provides a symbol for "B-Seam Projected" workings, but these workings have <br />not been depicted on the map. Please revise the map to represent the B-Seam Projected <br />workings, including the 1 West Mains. <br />• There are areas of red and green cross-hatching shown within the permit boundary, but the <br />Legend does not explain these symbols. Please add the red and green cross-hatching <br />symbols and explanations to the Legend. <br />• The source of the geologic base map is not identified - please provide a reference to the base <br />map used to develop Map 07. <br />• On the Strike and Dip symbols shown on the map (2) and Legend., the Dip is mistakenly <br />given in %. The numbers are correct, but the unit should be Degrees (°). Please modify each <br />of these symbols accordingly. <br />Maps 08 and 08A - Geologic Cross Sections <br />• In the map view at the bottom of the sheets, the Strike and Dip symbol for the west workings <br />has not been added. Please add the second strike/dip symbol to this view. <br />Map 27 - Subsidence <br />• The Legend indicates that the B-Seam Completed Workings are shown in a light purple <br />color, while dark purple is used on the map. Please ensure that a consistent color is used in <br />the Map and Legend. <br />This concludes my preliminary adequacy comments for PR-12. Please do not hesitate to contact <br />me with any questions that may arise. <br />cc: Sandy Brown, DRMS
The URL can be used to link to this page
Your browser does not support the video tag.