Laserfiche WebLink
<br />be filled to what it was prior to the excavation of its present condition. However we will <br />dump and push the surrounding waste rock that we screen to cover up against the pit floor <br />against the high wall with a graded slope. This will be an ongoing process If seeding is <br />required, we will spread rabbit bush seed after final reclamation. <br />The present roads will be maintained to a usable level during our operation to avoid <br />deterioration. The roads will remain after reclamation. <br />The old Caterpillar bull dozer has been removed. A gate has been placed at the entrance <br />to the mine area. <br />The existing cut on the south side of the hill we described as phase 2 will not be <br />disturbed by us for several years. However the previous prospector is going to reclaim <br />the site and possibly other tasks that are deemed necessary. <br />I hope that I have answered all of the issues you addressed in your letter. Please contact <br />me if you have any additional questions, and we will be glad to address any further <br />concerns you may have. <br />Sincerely, <br />Lucy ordova <br />Cc: Nick Sandoval, BLM, 1803 W Hwy 160, Monte Vista, CO 81144