My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-07_GENERAL DOCUMENTS - C1996084
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1996084
>
2010-05-07_GENERAL DOCUMENTS - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 2:30:02 PM
Creation date
5/10/2010 10:17:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
General Documents
Doc Date
5/7/2010
Doc Name
Midterm Review Findings Document
From
DRMS
To
New Elk Coal Company
Permit Index Doc Type
Findings
Email Name
KAG
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lorencito Canyon Mine C-1996-084 <br />Midterm Review No. 3 <br />PROJECT IDENTIFICATION <br />Date : 4-May-10 Permit C-96-084 Site: Lorencito Canyon Mine <br />User: JHB State : Colorado <br /> Filename: C084-000 County: Las Animas <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Midterm No. 3 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />001 -Push Spoil Into Hollow Fill Released - SL-01 $0 <br />002 -Load and Haul Spoil from Fill 8 to Jeff Canyon Mine Released - SL-01 $0 <br />003 -Spread Spoil at Jeff Canyon Mine Released - SL-01 $0 <br />004 -Load and Haul Bed Coal Released - SL-02 $0 <br />008 -Rip Jeff Canyon Topsoil Stockpile Base Released - SL-02 $0 <br />012 -Grade Jeff Canyon Mine Released - SL-01 $0 <br />013 -Grade Jeff Canyon Topsoil Stockpile Area Released - SL-01 $0 <br />014 -Grade Borrow Area 1 Released - SL-01 $0 <br />015 -Grade Borrow Area 2 Released - SL-01 $0 <br />016 -Grade Borrow Area 3 2.08 $241 <br />020 -Regrade Ditches at Loadout Released - SL-02 $0 <br />025 -Replace Topsoil from Stockpile BA#1 to Fill 7a 4.98 $5,440 <br />026 -Replace Topsoil from Stockpile SSP#2 to Fill 9a 7.42 $8,095 <br />027 -Replace Topsoil from Stockpile SSP#3 to Fill 8 13.20 $14,403 <br />028 -Replace Topsoil from Stockpile SSP#2 to N-1 8.28 $8,968 <br />029 -Replace Topsoil from Stockpile BA#2 to C-1 12.93 $13,974 <br />030 -Replace Topsoil from Stockpile BA#1 to C-2 8.10 $8,782 <br />031 -Replace Topsoil from Stockpile BA#2 to S-2 2.06 $2,549 <br />032 -Replace Topsoil from Stockpile BA#3 to S-4 3.43 $4,317 <br />033 -Replace Topsoil from Stockpile BA#2 to W-2 10.91 $13,752 <br />034 -Replace Topsoil from Stockpile BA#3 to W-3 3.02 $3,272 <br />035 -Replace Topsoil from Stockpile BA#3 to W-5 11.07 $13,956 <br />036 -Replace Topsoil from SA Stockpile to Service Area 0.23 $93 <br />037 -Replace Topsoil from Haul Road Stockpile to Service Area Released - SL-02 $0 <br />038 -Replace Live-Handled Topsoil to W-1 4.82 $1,942 <br />039 -Replace Topsoil from Upslope Area to W-1 4.80 $1,935 <br />040 -Replace Live-Handled Topsoil to W-4 1.92 $773 <br />041 -Replace Topsoil from Upslope Area to W-4 1.91 $770 <br />042 -Re lace Live-Handled Topsoil to W-6 1.72 $692 <br />JHB Page 1 5/5/2010
The URL can be used to link to this page
Your browser does not support the video tag.