Laserfiche WebLink
Lorencito Canyon Mine C-1996-084 <br />Midterm Review No. 3 <br />PROJECT IDENTIFICATION <br />Date : 4-May-10 Permit C-96-084 Site: Lorencito Canyon Mine <br />User: JHB State : Colorado <br /> Filename: C084-000 County: Las Animas <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Midterm No. 3 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />043 -Replace Topsoil from Upslope Area to W-6 0.85 $345 <br />044 -Replace Topsoil from Stockpile BA#3 to W-6 1.20 $1,523 <br />045 -Replace Live-Handled Topsoil to N-2 12.84 $5,178 <br />046 -Replace Topsoil from Upslope Area to N-2 12.79 $5,128 <br />047 -Replace Live-Handled Topsoil to S-3 1.09 $440 <br />048 -Replace Topsoil from Upslope Area to S-3 0.59 $236 <br />049 -Replace Topsoil from Stockpile BA#3 to S-3 0.70 $867 <br />050 -Replace Topsoil from Stockpile SSP#2 to N-1 4.17 $1,679 <br />051 -Replace Live-Handled Topsoil to E-2 0.92 $371 <br />052 -Replace Topsoil from Upslope Area to E-2 0.92 $369 <br />053 -Replace Live-Handled Topsoil to E-3 1.83 $740 <br />054 -Replace Topsoil from Stockpile BA#3 to E-3 1.30 $1,598 <br />055 -Replace Topsoil from Upslope Area to BA#1 1.61 $648 <br />056 -Replace Topsoil from Upslope Area to BA#2 1.92 $773 <br />057 -Replace Topsoil from Upslope Area to BA#3 4.31 $1,739 <br />058 -Replace Topsoil from Loadout Stockpile to Loadout Area Removed - TR-14 $0 <br />059 -Remove Topsoil from Knob Above Cut 31.35 $12,640 <br />065 -Plug and Seal 27 Drill Holes and Monitoring Wells 32.56 $13,374 <br />070 -Hydroseed Jeff Canyon Haul Road Steep Embankments Released - SL-02 $0 <br />071 -Broadcast Seed Jeff Canyon Topsoil Piles Released - SL-02 $0 <br />072 -Broadcast Seed Loadout Removed - TR-14 $0 <br />073 -Broadcast Seed Mine Site 126.00 $161,178 <br />074 -Hydroseed Steep Slopes at Mine Site 16.00 $56,455 <br />075 -Fertilize Mine Site During Year 2 84.00 $10,492 <br />076 -Fertilize Mine Site During Year 3 84.00 $10,492 <br />077 -Broadcast Seed Borrow Area 3 4.05 $5,048 <br />078 -Direct Shrub Seeding 9.00 $5,384 <br />082 -Clean Loadout Sediment Pond Released - SL-02 $0 <br />083 -Clean Sediment Ponds at Mine Site 124.62 $70,479 <br />JHB Page 2 5/5/2010