Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task # : 091 State : Colorado Permit/job #: C-1996-084 <br />Date : 0510412010 County: Las Animas Abbreviation :none <br />User : JHB Site : Lorencito Canyon Mine Filename : C084-091 <br />Permit or other job action :Midterm 3 <br />Task description : Mobilize/Demobilize Equipment for pond cleaning <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 907) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $18.82 $20.82 $23.42 <br />Operating cost/hour : $43.13 $45.10 $42.78 <br />Operator cost/hour : $23.90 $23.90 $23.90 <br />Helper cost/hour : $0.00 $19.49 $19.49 <br />Total Unit Cost/hour : $85.85 $109.31 $109.59 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D8R Series 11 - 8SU (20 52.55 $46.56 $109.59 1 $156.15 $109.59 $250.00 <br />-Cat 325C L 31.07 $37.15 $109.31 1 $146.46 $109.31 $250.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $302.61 $218.90 $500.00