Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Fuel Tanker, 6x4, 210 HP $79.88 1 $79.88 $79.88 <br />-Lube Truck, 6x4, 210 HP $95.16 1 $95.16 $95.16 <br />-Flatbed Truck, 6x4, 45K GVW $74.17 1 $74.17 $74.17 <br />-Light Duty Pickup, 4x4, 1 T. Crew $36.72 1 $36.72 $36.72 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $285.93 $285.93 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Trinidad <br />Transportation Cycle Time : Non- Total one-way travel distance : 20.0 miles <br /> Roadable Roadable Average travel speed : 35.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.57 0.57 Total non-roadable mob/demob cost $18,238.82 <br />Return time (hours) = 0.57 0.57 * two round trips with haul rig <br />Loading time (hours) = 0.75 NA Total roadable mob/demob cost ** : $326.77 <br />Unloading time (hours) = 0.75 NA •* one round trip, no haul rig <br />Subtotals = 2.64 1.14 <br />JOB TIME AND COST Total job time : 5.29 hours <br /> Total job cost : $18,566