Truck/Loader Team Work cont'd Task # : 083 sheet 2 of 2 <br />Loading Tool Cycle Time : Number of loading tool passes required to fill truck 6 passes <br />Excavators and front shovels -machine cycle time vs. job condition rating : SEVERE <br />-selected value within basic rating : SEVERE <br />Track loaders - material descr.: NA <br />- cycle time elements (min.) : Load <br />NA Maneuver : NA Dump : 0.100 <br />Wheel and track loaders - unadjusted basic loader cycle time ( load, maneuver, and duml NA minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material : NA NA NA <br />Stockpile: NA NA NA <br />Truck ownership: NA NA NA <br />Operation : NA NA NA <br />Dump target : NA NA NA <br /> Net cycle time adjustment : NA minutes <br /> Adjusted loader cycle time (total time per loader pass) : 0.403 minutes <br /> Net load time per truck * : 2.115 minutes <br />Truck Cycle Time : • bulk of 1st loader cycle completed during truck exchange if adj. loader cycle time < exchange time <br />Truck exchange time **: 0.50 minutes........ Adjusted for site altitude : 0.500 minutes <br />Truck load time: 2.115 minutes........ Adjusted for site altitude : 2.115 minutes <br />Truck maneuver and dump time: 0.90 minutes........ Adjusted for site altitude : 0.900 minutes <br />•• set at 0 if exchange time < adj. loader cycle time (truck exchange completed during 1 st loader cycle) <br />Truck travel (haul & return) time: Road condition : Rutted dirt, little maintenance, no water, 2" tire penetration <br />Haul route : <br />Road <br />segment# Haul distance Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (%) Speed Travel time <br />(minutes) <br />1 5,000 5.00 5.00 10.00 1068 4.695 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : <br />Haul time ** : 4.695 minutes <br />minutes <br />minutes <br />Loading tool unit production : 267.42 LCY/hour...... Adjusted for job efficiency : 221.96 LCY/hour <br />Truck unit production : 70.37 LCY/hour...... Adjusted for job efficiency : 58.41 LCY/hour <br />Optimal no. trucks/loading tool : 4 trucks........... Selected no. trucks/loader : 4 trucks <br /> Adjusted hourly truck team production : 233.64 LCY/hr <br /> Adjusted hourly single truck/loader team production : 221.96 LCY/hr <br /> Adjusted hourly multiple truck/loader team production : 221.96 LCY/hr <br /> <br />JOB TIME AND COST .......... <br />Fleet size : 1 Team(s) Total job time : 124.62 Hours <br />Unit cost : $2.548 /LCY Total job cost : $70,479 <br /> <br />" travel time shown for each segment includes acceleration/deceleration adjustment Return time**: 1.727 <br />• total haul and return time shown includes altitude adjustment Total truck cycle time : 9.937