Laserfiche WebLink
PROJECT IDENTIFICATION <br />Agency or orgat <br />Task #: 083 <br />Date : 0510412010 <br />User : JHB <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />iization name : Colorado Division Of Reclamation, Mining And Safety <br />State : Colorado Permit/job #: C-96-084 <br />_ County : Las Animas Abbreviation : none <br />Site : Lorencito Canyon Mine Filename : C084-083 <br />Permit or other job action :Midterm 3 <br />Task description : Clean Sediment Ponds at Mine Site <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />(Equipment Description <br />Truck/loader team -Truck l Generic 10-12 cy, 6x4 <br />-Loader : Cat 325C L <br />Support equipment -Load area :NA <br />-Dump area : Cat D8R Series 11 - 8SU <br />Road maintenance -Motor grader: NA <br />-Water truck : NA <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 excavate NA dozer NA NA <br />% Utilization-machine : 95 100 NA 100 NA NA <br />-Ripper attachment : NA NA NA 0 NA NA <br />Ownership cost/hour : $13.34 $37.15 NA $46.56 NA NA <br />Operating cost/hour : $36.94 $43.69 NA $70.63 NA NA <br />Ripper op. cost/hour : NA NA NA $0.00 NA NA <br />Operator cost/hour : $22.29 $38.72 NA $38.54 NA NA <br />Unit subtotals : $72.57 $119.56 NA $155.72 NA NA <br />Number of units : 4 1 0 1 0 0 <br />Group subtotals : Work : $409.82 Support : $155.72 Maintenance : $0.00 <br />Total work team cost/hour : $565.55 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 21,780 BCY factor : 1.270 volume : 27,661 LCY <br />Source of quantity take-off :Operator Estimate <br />Source of estimated swell factor : CAT Handbook <br />Material purchase cost : $0.00 /LCY Total cost <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis : <br />Material weight : Z700 pounds/LCY Struck volume : <br />Descr.: Earth - wet excavated Heaped volume : <br />Rated payload : 35,400 pounds Average volume : <br />Payload capacity: 13.11 LCY Adjusted volume': <br />Final truck volume based on number of loader passes <br />truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Correctioi <br />Rated capacity (nom. heaped) : 2.220 LCY Truck <br />Descr.: Loose material - 112" to 314" ( 85 - 90% Altitude adj.: 1.000 <br />Bucket fill factor : 0.875 Job efficiency : 0.830 <br />Adjusted bucket capacity : 1.943 LCY Net correction : 0.830 <br />sheet 1 of 2 <br />$0 <br />10.00 LCY <br />12.00 LCY <br />11.00 LCY <br />12.00 LCY <br />11.66 LCY <br />Site altitude (ft.) : 7,000 <br />Loader Source <br />1.000 (Cat HB, <br />0.830 (1 shif Ida <br />0.830