Page 2 of 2
<br />Project Identification
<br /> Agency or organization name: Colorado Division of Minerals and Geology
<br />Task #: 3 Permit/job#: C2009-87
<br />Date: 4/29/2010 Abbreviati on:
<br />User: jhb Filename: C:1jhb1TEAM1Peabody Sage Creek Mine1RCE1C2009-087
<br />Permitting action: New Application Source of unit costs: 2010 RS Means
<br />Task description: Demolish structures at North facilites, remove materials and debris
<br /> Last unit cost update: 2010
<br />STRUCTURE or ITEM DESCRIPTION CIRCES DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST
<br /> (Dimensions in ft or cf unless noted)
<br /> 1 $
<br />8. Covered storage Buildings
<br />two buildings 150 X 50 X 20.0 Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. he 300,000 Cf $ 0.27 $ 81,000
<br />two buildings 100 X 30 X 20.0 Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. ha 120,000 Cf $ 0.27 $ 32,400
<br />footers for 4 storage bldgs. 500 320 Demo. and on-site disposal in existing pit, 1.0 ft. x 2 ft. - Max. 10,000 ft. h 820 If $11.09 $ 9,094
<br />9. Office 10 X 60 X 50 Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. ha 30,000 Cf $ 0.27 $8,100.00
<br />dimensions from Seneca II Mine SL3 est.
<br />Office floor 50 x 60 x 1 Demo. and on-site disposal in existing pit, 4 in. thick - Max. 10,000 ft. har. 3,000 sf $ 3.13 $9,390.00
<br />office parking lot-gravel
<br />10. Security building & gate 12 x 40 x 10 Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. ha 4,800 Cf $0.27 $1,296.00
<br />Map 2.05.3 M1 B
<br />Office slab 4" thick
<br />15 x
<br />45
<br />1
<br />Demo. and on-oft disposal in existing pit, 4 in. thick - Max. 10,000 ft. haul
<br />675
<br />sf
<br />$
<br />3.13
<br />$2,112.75
<br />Electrical parts building
<br />11 30 x 22 x 10 Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. he 6,600 cf $0.27 $1,782.00
<br />.
<br />Elec. Parts bldg. floor 30 x 22 x 1 Demo. and on-oft disposal in existing pit, 4 in. thick - Max. 10,000 ft. haul 660 sf $ 3.13 $2,065.80
<br />12. Lean-to (SII SL3 est.) 100 x 12 x 10 Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. ha 12,000 Cf $ 0.27 $3,240.00
<br />13. Parts Building (SII SL3 est.) 110 x 70 x 20 Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. ha 154,000 Cf $ 0.270 $41,580.00
<br />Parts bldg. floor 110 x 70 x 1 Demo. and on-oft disposal in existing pit, 4 in. thick - Max. 10,000 ft. haul 7,700 sf $ 3.13 $24,101.00
<br />14. Vehicle Maintenance Shop 140 x 80 x 20 Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. ha 224,000 Cf $ 0.27 $60,480.00
<br />Map 2.05.3 M1 B & SII SL3 est.
<br />VMS floor
<br />140 x
<br />80 x
<br />1
<br />Demo. and on-site disposal in existing pit 6 in. thick - Max. 10,000 ft. haul
<br />11,200
<br />sf
<br />$
<br />4.170
<br />$46,704.00
<br />15. Welding Shop 90 x 56 x 15 Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. ha 75,600 Cf $ 0.27 $20,412.00
<br />Welding shop floor 90 x 56 x 1 Demo. and on-oft disposal in existing pit, 4 in. thick - Max. 10,000 ft. haul 5,040 sf $ 3.130 $15,775.20
<br />Foundation 292 x 1 x 1 Demo. and on-site disposal in existing pit, 1.0 ft. x 2 ft. - Max. 10,000 ft. h 292 If $ 11.090 $3,238.28
<br />16. Maintenance shop 120 x 42 x 15 Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. ha 75,600 Cf $0.27 $20,412.00
<br />Maint. Shop floor 120 x 42 x 1 Demo. and on-oft disposal in existing pit, 4 in. thick - Max. 10,000 ft. haul 5,040 sf $ 3.130 $15,775.20
<br />foundation 324 x 1 x 1 Demo. and on-site disposal in existing pit, 1.0 ft. x 2 ft. - Max. 10,000 ft. h 324 If $11.09 $3,593.16
<br /> pag e subtotal= _$TM _W
<br />17. concrete disposal on site: Add $7. 77/CY on site $5,126.75
<br /> Direct cost total= $557,990.64
<br /> cost adusted for location: =total direct cost * 105.7% _ $ 589,796.11 Total with CCI= $589,796.11
|