Demolition Work
<br /> Page 1 of 2
<br />Project Identification
<br />Agency or organization name: Colorado Division of Minerals and Geology
<br />Task #: 3 Permit/job#: C2009-87
<br />Date: 412912010 Abbreviation:
<br />User: jhb Filename: CAjhb\TEAM\Peabody Sage Creek Mine\RCE\C2009-087
<br />Permitting action: New Application Source of unit costs: 2010 RS Means
<br />Task description: Demolish structures at North facilites, remove materials and debris
<br /> Last unit cost update: 2010
<br />STRUCTURE or ITEM DESCRIPTION CIRCES DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST
<br />(Dimensions in ft or cf unless noted)
<br /> If $
<br />Dimensions from text & Map 2.05.3-M1A
<br />$ _
<br /> $
<br />1. parking lot gravel (truckiloader task)
<br />$ _
<br />office area, Parts storage, Maint. Area, east of boneyard parking
<br />Security building 12 x 40 x
<br />2 10 Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. ha 4,800 Cf $ 0.27 $ 1,296
<br />.
<br />concrete floor 15 X 45 X 0.3 Demo. and on-oft disposal in existing pit, 4 in. thick - Max. 10,000 ft. haul 203 Sf $5.80 $ 1,175
<br /> 1 $ - $
<br />3. a) Bathhouse 42 X 40 x 10.0 Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. ha 16,800 Cf $ 0.27
<br />13
<br />3 $
<br />$ 4,536
<br />5
<br />258
<br />b) bathhouse floor slab 42 x 40 X 0.3 Demo. and on-oft disposal in existing pit, 4 in. thick - Max. 10,000 ft. haul 1,680 sf
<br />If
<br />160 .
<br />$
<br />$13
<br />30 $ ,
<br />128
<br />2
<br />c) bathhouse footers 84 76 Demo. and on-site disposal in existing pit, 1.5 ft. x 2 ft. - Max. 10,000 ft. h . . ,
<br /> 1 $
<br />4. a) Diesel Tank 20,000 gal 20K Haul tank to certified salvage dump - 9,000 to 12,000 gal. Tank 2 ea
<br />2 $1,000.00
<br />00
<br />$369 $
<br />$ 2,000
<br />738
<br />assume 5% sludge clean out 1000 Remove sludge, water, and rem. product from tank - 9,000 to 12,000 gal. ea
<br />300 Ib .
<br />25
<br />$ 2 $ 675
<br />Dry ice for inert transport 20K Insert dry ice (C02) into tank to produce inert gas -1.5 Ibs.1100 gal. s
<br />1 ea .
<br />$700
<br />00 $ 700
<br />b) Unleaded fuel tank 2000 Haul tank to certified salvage dump - 3,000 to 5,000 gal. Tank 1 ea .
<br />$221
<br />00 $ 221
<br />assume 5% sludge clean out 100 Remove sludge, water, and rem. product from tank - 3,000 to 5,000 gal. 30 Ibs .
<br />$2
<br />25 $ 68
<br />Dry ice for inert transport 2000 Insert dry ice (C02) into tank to produce inert gas -1.5 lbs./100 gal. 1 ea .
<br />00
<br />$ 700 $ 700
<br />c) Mag chloride tank 2500 Haul tank to certified salvage dump - 3,000 to 5,000 gal. Tank 3 ea .
<br />$ 700
<br />00 $ 2
<br />100
<br />d) Used oil tanks (3) 3.0 x 2000 Haul tank to certified salvage dump - 3,000 to 5,000 gal. Tank 3 ea .
<br />$221
<br />00 $ ,
<br />663
<br />assume 5% sludge cleanout 3.0 X 100 Remove sludge, water, and rem. product from tank - 3,000 to 5,000 gal. 90 Ibs .
<br />$2
<br />25 $ 203
<br />Dry ice for inert transport 3.0 X 2000 Insert dry ice (C02) into tank to produce inert gas - 1.5 Ibs.1100 gal. 120 C .
<br />85
<br />$ 123 $ 14
<br />862
<br />e) tank pads 120 Slab on grade, concrete, demolition only - Mesh reinforcing y . $ ,
<br />push 120cy broken concrete to pit 1
<br />1 $ -
<br />$
<br />$ _
<br />5. Electrical Substation slabs 12 X 30 X 1.0 Demo. and on-site disposal in existing pit, 4 in. thick - Max. 10,000 ft. hat, 360 sf
<br />400 If $ 3.13
<br />$2
<br />77 $
<br />$ 1,127
<br />73
<br />128
<br />a) Powedines 5 miles Seneca II SL3 estimate 3/2009 26,
<br />1 . $ ,
<br />4 8" cased boreholes 250ft. deep Cost BOREHOLES as Borehole task 1 ea 00
<br />000
<br />$ 1 $ 1
<br />000
<br />6. a) Water storage Tank 10K 10K Haul tank to certified salvage dump - 9,000 to 12,000 gal. Tank .
<br />500
<br />2 ,
<br />.
<br />$ 2
<br />38 $ ,
<br />5
<br />950
<br />b) water tank foundation 50 x 50 X 1.0 Demo. and on-site disposal in existing pit, 8 in. thick - Max. 10,000 ft. hay ,
<br />f
<br />800 .
<br />27
<br />$0 $ ,
<br />216
<br />c) Well & Pumphouse 10 X 10 X 8.0 Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. ha C .
<br /> 1 $
<br />7. a) Septic Tank 100,000 gal 2010 R.S.Means 02 41 13.44 1100
<br />h
<br />000 ft
<br />10 1 ea.
<br />000 Cf
<br />1 $31,300.00
<br />27
<br />$ 0 $
<br />$ 31,300
<br />270
<br />b) Lift Station 10 X 10 X 10.0 .
<br />a
<br />,
<br />Bldg. demo. and on-site disposal in existing pit or cut -Max. , .
<br />page subtotal= 150,313
|