Laserfiche WebLink
Demolition Work <br /> Page 1 of 2 <br />Project Identification <br />Agency or organization name: Colorado Division of Minerals and Geology <br />Task #: 3 Permit/job#: C2009-87 <br />Date: 412912010 Abbreviation: <br />User: jhb Filename: CAjhb\TEAM\Peabody Sage Creek Mine\RCE\C2009-087 <br />Permitting action: New Application Source of unit costs: 2010 RS Means <br />Task description: Demolish structures at North facilites, remove materials and debris <br /> Last unit cost update: 2010 <br />STRUCTURE or ITEM DESCRIPTION CIRCES DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST <br />(Dimensions in ft or cf unless noted) <br /> If $ <br />Dimensions from text & Map 2.05.3-M1A <br />$ _ <br /> $ <br />1. parking lot gravel (truckiloader task) <br />$ _ <br />office area, Parts storage, Maint. Area, east of boneyard parking <br />Security building 12 x 40 x <br />2 10 Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. ha 4,800 Cf $ 0.27 $ 1,296 <br />. <br />concrete floor 15 X 45 X 0.3 Demo. and on-oft disposal in existing pit, 4 in. thick - Max. 10,000 ft. haul 203 Sf $5.80 $ 1,175 <br /> 1 $ - $ <br />3. a) Bathhouse 42 X 40 x 10.0 Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. ha 16,800 Cf $ 0.27 <br />13 <br />3 $ <br />$ 4,536 <br />5 <br />258 <br />b) bathhouse floor slab 42 x 40 X 0.3 Demo. and on-oft disposal in existing pit, 4 in. thick - Max. 10,000 ft. haul 1,680 sf <br />If <br />160 . <br />$ <br />$13 <br />30 $ , <br />128 <br />2 <br />c) bathhouse footers 84 76 Demo. and on-site disposal in existing pit, 1.5 ft. x 2 ft. - Max. 10,000 ft. h . . , <br /> 1 $ <br />4. a) Diesel Tank 20,000 gal 20K Haul tank to certified salvage dump - 9,000 to 12,000 gal. Tank 2 ea <br />2 $1,000.00 <br />00 <br />$369 $ <br />$ 2,000 <br />738 <br />assume 5% sludge clean out 1000 Remove sludge, water, and rem. product from tank - 9,000 to 12,000 gal. ea <br />300 Ib . <br />25 <br />$ 2 $ 675 <br />Dry ice for inert transport 20K Insert dry ice (C02) into tank to produce inert gas -1.5 Ibs.1100 gal. s <br />1 ea . <br />$700 <br />00 $ 700 <br />b) Unleaded fuel tank 2000 Haul tank to certified salvage dump - 3,000 to 5,000 gal. Tank 1 ea . <br />$221 <br />00 $ 221 <br />assume 5% sludge clean out 100 Remove sludge, water, and rem. product from tank - 3,000 to 5,000 gal. 30 Ibs . <br />$2 <br />25 $ 68 <br />Dry ice for inert transport 2000 Insert dry ice (C02) into tank to produce inert gas -1.5 lbs./100 gal. 1 ea . <br />00 <br />$ 700 $ 700 <br />c) Mag chloride tank 2500 Haul tank to certified salvage dump - 3,000 to 5,000 gal. Tank 3 ea . <br />$ 700 <br />00 $ 2 <br />100 <br />d) Used oil tanks (3) 3.0 x 2000 Haul tank to certified salvage dump - 3,000 to 5,000 gal. Tank 3 ea . <br />$221 <br />00 $ , <br />663 <br />assume 5% sludge cleanout 3.0 X 100 Remove sludge, water, and rem. product from tank - 3,000 to 5,000 gal. 90 Ibs . <br />$2 <br />25 $ 203 <br />Dry ice for inert transport 3.0 X 2000 Insert dry ice (C02) into tank to produce inert gas - 1.5 Ibs.1100 gal. 120 C . <br />85 <br />$ 123 $ 14 <br />862 <br />e) tank pads 120 Slab on grade, concrete, demolition only - Mesh reinforcing y . $ , <br />push 120cy broken concrete to pit 1 <br />1 $ - <br />$ <br />$ _ <br />5. Electrical Substation slabs 12 X 30 X 1.0 Demo. and on-site disposal in existing pit, 4 in. thick - Max. 10,000 ft. hat, 360 sf <br />400 If $ 3.13 <br />$2 <br />77 $ <br />$ 1,127 <br />73 <br />128 <br />a) Powedines 5 miles Seneca II SL3 estimate 3/2009 26, <br />1 . $ , <br />4 8" cased boreholes 250ft. deep Cost BOREHOLES as Borehole task 1 ea 00 <br />000 <br />$ 1 $ 1 <br />000 <br />6. a) Water storage Tank 10K 10K Haul tank to certified salvage dump - 9,000 to 12,000 gal. Tank . <br />500 <br />2 , <br />. <br />$ 2 <br />38 $ , <br />5 <br />950 <br />b) water tank foundation 50 x 50 X 1.0 Demo. and on-site disposal in existing pit, 8 in. thick - Max. 10,000 ft. hay , <br />f <br />800 . <br />27 <br />$0 $ , <br />216 <br />c) Well & Pumphouse 10 X 10 X 8.0 Bldg. demo. and on-site disposal in existing pit or cut - Max. 10,000 ft. ha C . <br /> 1 $ <br />7. a) Septic Tank 100,000 gal 2010 R.S.Means 02 41 13.44 1100 <br />h <br />000 ft <br />10 1 ea. <br />000 Cf <br />1 $31,300.00 <br />27 <br />$ 0 $ <br />$ 31,300 <br />270 <br />b) Lift Station 10 X 10 X 10.0 . <br />a <br />, <br />Bldg. demo. and on-site disposal in existing pit or cut -Max. , . <br />page subtotal= 150,313