Laserfiche WebLink
Page 2 of 4 <br />New Application, Cost Summary <br />"-T <br />51 u1 Colorado Division of Reclamation, Mining and Safety <br />?IX1G ?' S.f FTY <br />Reclamation Cost Summary <br />Permit No. C-2009-087 Prepared by: JHB Date: 5/7/2010 <br />Mine name: Peabody Sage Creek County: Routt <br /> Permit or job action: <br />TASK LIST (D IRECT COSTSI Permit Application <br /> 1 100% 0.00 $0 <br />6 Rip Haulroad A reduction ripper 5.77 $1,195 100% 5.77 $1,195 <br />7 Regrade haulroad A reduction dozer 39.03 $15,737 100% 39.03 $15,737 <br />11 Rip Haulroad A-1 Reduction ripper 2.89 $599 100% 2.89 $599 <br />12 regrade haulroad A-1 reduction dozer 45.57 $9,186 100% 45.57 $9,186 <br />13 replace topsoil on reduced portion of Haulroad A-1 1 3.89 $3,504 100% 3.89 $3,504 <br />17 Rip Haul road A-2 removal ripper 3.81 $789 100% 3.81 $789 <br />18 regrade Hauroad A-2 removal dozer 53.78 $10,843 100% 53.78 $10,843 <br />19 replace topsoil on reduced portion of Haulroad A-2 scraper1 3.79 $3,405 100% 3.79 $3,405 <br />23 Rip Haulroad B reduction ripper 4.66 $966 100% 4.66 $966 <br />24 regrade Haulroad B reduction dozer 53.39 $10,763 100% 53.39 $10,763 <br />28 Rip Haulroad B-1 reduction ripper 1.74 $360 100% 1.74 $360 <br />29 Regrade haulroad B-1 reduction dozer 20.55 $4,143 100% 20.55 $4,143 <br />30 Replace topsoil on Haulroad B-1 scraper1 2.16 $1,944 100% 2.16 $1,944 <br />40 Rip haulroad C reduction ripper 2.17 $448 100% 2.17 $448 <br />41 Regrade Haulroad C reduction dozer 23.47 $4,731 100% 23.47 $4,731 <br />42 Replace topsoil on Haulroad C Reduction scraper1 1.73 $1,559 100% 1.73 $1,559 <br />46 rip Haulroad D removal ripper 2.18 $452 100% 2.18 $452 <br />47 Regrade Haulroad D removal dozer 28.19 $5,683 100% 28.19 $5,683 <br />48 Replace topsoil on Haulroad D removal scraper1 2.03 $1,830 100% 2.03 $1,830 <br />50 reseed reclaimed roads revege 16.00 $14,432 100% 16.00 $14,432 <br />78 Seal 4 Water wells excel 13.11 $10,600 100% 13.11 $10,600 <br />79 Backfill UCSS sump dozer 4.25 $1,096 100% 4.25 $1,096 <br />80 backfill LCSS sump dozer 12.76 $3,293 100% 12.76 $3,293 <br />81 Clean sediment form UCSS & LCSS dispose @ Foidel Creek Refuse pile truck 62.33 $34,350 100% 62.33 $34,350 <br /> 100% 0.00 $0 <br />Liability transferred from Seneca 11 Mine 100% 0.00 $0 <br />64 Pre-law area remaining 68.79 acres BR61 Sum2 1.00 $285,484 100% 1.00 $285,484 <br />89 BR62 310.21 ac Phase II released revege 155.11 $231,054 100% 155.11 $231,054 <br />90 BR63 851.81 ac Phase II released (Acres remaining in Seneca II permit rem revege 212.95 $634,455 100% 212.95 $634,455 <br />91 BRB4 448.25 ac Phase II released (Acres remaining in Seneca II permit remo revege 112.06 $333,871 100% 112.06 $333,871 <br />92 pond maintenance; clean sediment from Pecoco, 004 & 003 truck 4.73 $2,619 100% 4.73 $2,619 <br /> Subtotal - this page 2287.16 $1,629,391