Laserfiche WebLink
Page 1 of 4 <br />New Application, Cost Summary <br />Colorado Division of Reclamation, Mining and Safety <br />.,, IriG . SAFETY <br />Reclamation Cost Summary <br />Permit No. C-2009-087 Prepared by: JHB Date: 5/7/2010 <br />Mine name: Peabody Sage Creek County: Routt <br /> Permit or job action: <br />TASK LIST (D IRECT COSTS Permit Application <br /> <br />New Task <br />no. <br /> <br />Task description <br />Form <br />Used Task <br />Hours <br />(100% <br />Liability) Direct <br />° <br />Cost (100 /° <br />Liability) <br />% Liability <br />Remaining Task Hours <br /> <br />(Actual <br />Liability) Direct Cost <br /> <br />(Actual <br />Liability) <br />North Surface Facilities Area <br />3 Demolition and disposal of North Facilities and Sturctures excel 130.00 $589,796 100% 130.00 $589,796 <br />65 Remove gravel from North facilities parking lot truck 6.45 $7,468 100% 6.45 $7,468 <br />66 Rip North Facilities parking lot ripper 3.24 $842 100% 3.24 $842 <br />67 Remove gravel from main North facilities area truck 15.61 $18,027 100% 15.61 $18,027 <br />68 Rip 6.0 acres North Facilities area ripper 7.48 $1,944 100% 7.48 $1,944 <br />70 Remove gravel from 1.6 acre North facilities electrical shop area truck 4.20 $4,852 100% 4.20 $4,852 <br />71 Rip 1.6 acre North facilities electrical shop area rpper 2.00 $518 100% 2.00 $518 <br />72 Remove gravel from 0.3 acre North Facilities Office area truck 0.82 $949 100% 0.82 $949 <br />73 Rip 0.3 area North facilities office area ripper 0.37 $97 100% 0.37 $97 <br />75 Reseed North facilities areas revege 10.60 $9,312 100% 10.60 $9,312 <br /> 100% 0.00 $0 <br />South Surface Facilities Area 100% 0.00 $0 <br />2 Demolition and disposal of South Facilities Structures excel 180.00 $796,278 100% 180.00 $796,278 <br />51 Remove Coal Stockpile footprint, haul to portal face up truck 15.73 $17,605 100% 15.73 $17,605 <br />52 Haul backfill material from coal handling facility to portal face-up truck 285.46 $362,479 100% 285.46 $362,479 <br />53 Haul backfill material from utility pad area to portal face-up truck 119.93 $208,861 100% 119.93 $208,861 <br />54 Haul backfill material from South Facilities pad to portal face-up truck 208.75 $318,790 100% 208.75 $318,790 <br />55 Haul backfill material from explosives storage pad to portal face-up dozer 10.08 $1,642 100% 10.08 $1,642 <br />56 push backfill material from facilities W of ramp to portal face-up dozer 18.53 $9,562 100% 18.53 $9,562 <br />57 replace topsoil on Coal Handling facilites area 1 19.05 $15,181 100% 19.05 $15,181 <br />58 Replace topsoil on Portal face-ip footprint scraperl 22.27 $17,742 100% 22.27 $17,742 <br />59 Replace topsoil on 0.33 ac. Facilities W of ramp scraperl 0.72 $574 100% 0.72 $574 <br />60 Replace topsoil on 4.79 ac. Utility Pad 1 10.18 $8,115 100% 10.18 $8,115 <br />61 Replace topsoil on 5.04 ac. South Facilities Storage area 1 9.42 $7,506 100% 9.42 $7,506 <br />62 Replace topsoil on 1.5 ac. Explosives Storage Area scraperl 4.19 $3,342 100% 4.19 $3,342 <br />63 Reseed South Facilities Area revege 26.75 $24,120 100% 26.75 $24,120 <br /> Subtotal - this page 1111.83 11 $2,425,602