My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-07_APPLICATION CORRESPONDENCE - C2009087
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2009087
>
2010-05-07_APPLICATION CORRESPONDENCE - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:35 PM
Creation date
5/10/2010 10:04:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
APPLICATION CORRESPONDENCE
Doc Date
5/7/2010
Doc Name
Revised Reclamation Cost Estimate (Memo)
From
Janet Binns
To
Tom Kaldenbach
Email Name
TAK
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : <br />Material weight : 2,075 <br />Material description : <br />USER-PROVIDED WEIGHT DATA <br />sheet 2 of 2 <br />pounds/LCY <br />Rated payload : 75,000 pounds <br />Payload capacity : 36.14 LCY <br />Scraper Bowl (volume) Basis : <br />Struck volume : 24.00 LCY <br />Heaped volume : 34.00 LCY <br />Average volume : 29.00 LCY <br />Adjusted capacity : 29.00 LCY <br />'hourly production reflects volume per scraper pair on push-pull models <br />Cycle Time : Job Condition Corrections : Site altitude (ft.) : 6,900 <br /> Scraper Push dozer Source <br />Scraper loading time 1.00 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 NA (Cat HB) <br />* load time per scraper pair on push-pull models Net correction : 0.830 NA <br />Travel time : <br />Road condition description :Firm, smooth, rolling, dirt/It, surfaced, watered, maintained <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)"" <br />1 3,728 2.00 3.00 5.00 1867 2.12 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : <br />Haul time : 2.12 minutes <br />3.00 1.00 2963 1.38 <br />** travel time for each segment is adjusted for acceleration/deceleration. Return time : 1.38 minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 5.10 minutes <br />Unadjusted unit production/hour : 681.78 LCY/hour `** Adjusted for job conditions : 565.87 LCY/hour <br />Optimal number of scrapers per push dozer: NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 565.87 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 565.87 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 3.89 Hours <br />Unit cost : $1.590 /LCY Total job cost : $3,504
The URL can be used to link to this page
Your browser does not support the video tag.