Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimatina Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Division of Reclamation, Mining And Safety <br />Task #: 013 State : Colorado Permit/job # : C2009-087 <br />Date : 0310512010 County :Routt Abbreviation :none <br />User: JHB Site : Peabody Sage Creek Mine Filename : C087-013 <br />Permit or other job action :New Application <br />Task description :Replace topsoil on reduced portion of Haulroad A-1 <br />HOURLY EQUIPMENT COST <br />Shift basis : I per day <br />(Equipment Description <br />Scraper work team -Scraper : Cat 637G w/push pull <br />-Push dozer:NA <br />Cost Br( <br />Support equipment -Load area : NA <br />-Dump area :Cat D8R Series 11- 8SU (2005) <br />Road maintenance -Motor grader : CAT 14H <br />-Water truck : Water Tanker, 10,000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA dozer grader misctruk <br />% Utilization-machine : 100 NA NA 25 25 25 <br />-Ripper attachment : NA NA NA NA 0 NA <br />Ownerhip cost/hour : $109.89 NA NA $46.56 $41.79 $62.58 <br />Operating cost/hour : $163.34 NA NA $17.66 $11.56 $21.28 <br />Ripper op. cost/hour : NA NA NA $0.00 $0.00 $0.00 <br />Operator cost/hour : $24.98 NA NA $38.54 $24.50 $38.70 <br />Unit subtotals : $298.21 NA NA $102.75 $77.85 $122.56 <br />Number of units : 2 0 0 1 1 1 <br />Group subtotals : Work : $596.43 Support : $102.75 Maintenance : $200.41 <br />Total work team cost/hour : $899.59 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,000 CCY factor : 1.102 volume : 2204 LCY <br />Source of quantity take-off : Map 2.05.3 MIA, area X 9" topsoil replacement <br />Source of estimated swell factor : Seneca 11 SL3 RCE