Laserfiche WebLink
Roads: <br />All roads were in good shape with minimal ruts. They were dry at the time of the inspection. <br />Permanent Light Use Road near Pond D Temporary Light Use Road <br />Hydrologic Balance: The loadout pond was full and generally in good shape with exceptions: <br />• The primary spillway pipe needs immediate cleanout at the downstream end. <br />• Willows exceeding 10 feet in height are growing in the channel below the emergency spillway <br />and on the embankment. These need to be removed. <br />• Minor rodent holes were observed in the embankment. These need to be filled. <br />The maintenance tasks for the problems with willows and rodent holes are not necessary if the pond is <br />reclaimed in year 2010. <br />A small discharge was observed from the primary spillway of the loadout pond. The water was clear. <br />Loadout Pond facing Northwest <br />4 of 6 WHITE - File YELLOW - Operator PINK - Specialist