My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-03_REVISION - M1977344 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977344
>
2010-05-03_REVISION - M1977344 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:29:18 PM
Creation date
5/5/2010 7:20:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
REVISION
Doc Date
5/3/2010
Doc Name
Submittal
From
Holcim
To
DRMS
Type & Sequence
TR9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The table below shows the size distribution of the screened reject product. <br />Holcim Portland Plant. Screen rejects Stockpile <br />Date: March 19, 2010 <br /> Screen Size Weight retained <br />Screen Opening 1.5 in 158.5 g <br />Screen Opening 1 in 686.79 <br />Screen Opening 0.75 in 643.7 g <br />Screen Opening 518 in 163.9 g <br />Screen Opening 0.5 in 220.8 g <br />Screen Opening 318 in 136.49 <br />Passing 318 in 317.89 <br /> Total 2327.8 <br />Percent <br />6.8% <br />29.5 % <br />27.7 % <br />7.0% <br />9.5% <br />5.9% <br />13.7 % <br />100.0% <br />The majority of the material is the the 1" to .75" size fraction and is well distributed. This will allow <br />for good compaction when placed in lifts with no stability issues. <br />Enclosed is payment for the $216 technical revision fee. Should you have any questions please <br />do not hesitate to contact me at (719) 784-1209. Thank you for your attention to this matter. <br />Sincerely, <br />Joe Lamanna <br />Quarry Manager <br />Holcim (US) Portland Plant <br />Cc: Joel Bolduc, Environmental Manager, Potland Plant
The URL can be used to link to this page
Your browser does not support the video tag.